Dr. Golam Kabir

Dr. Golam Kabir
Assistant Professor
519-253-3000 ext. 5921
Golam.Kabir@uwindsor.ca
Office: 3013 CEI

Education

  • PhD, Civil Engineering, University of British Columbia (UBC), Canada, 2016
  • MSc, Industrial and Production Engineering, Bangladesh University of Engineering and Technology (BUET), Bangladesh, 2011
  • BSc, Industrial and Production Engineering, Bangladesh University of Engineering and Technology (BUET), Bangladesh, 2009

Research Interests

  • System risk, reliability, resilience assessment
  • Interdependent network resilience analytics
  • Multi-criteria decision analysis under risk and uncertainty
  • Sustainable system analytics
  • Data driven decision making
  • Multi-objective Optimization

Professional Affiliations

  • IISE, AWWA, CNAM, CSCE

Selected Publications

  • Abebe, Y., Kabir, G., Tesfamariam, S. 2018. Assessing urban areas vulnerability to pluvial flooding using GIS applications and Bayesian Belief Network model. Journal of Cleaner Production, 174, 1629-1641.
     
  • Ghosh, M., Kabir. G., Hasin, M.A.A. 2017. Project time-cost trade-off: A Bayesian approach to update project time & cost estimates. International Journal of Management Science and Engineering Management, 12(3), 206-215.
     
  • Kabir, G., Tesfamariam, S., Francisque, A., Sadiq, R. 2015. Evaluating risk of water mains failure using a Bayesian belief network model. European Journal of Operational Research, 240(1), 220–234.
     
  • Kabir, G., Demissie, G., Sadiq, R., Tesfamariam, S. 2015. Integrating failure prediction models for water mains: Bayesian belief network based data fusion. Knowledge-Based Systems, 85, 159-169.
     
  • Kabir, G. Sumi, R.S. 2014. Power Substation location selection using fuzzy analytic hierarchy process and PROMETHEE: A case study from Bangladesh. Energy, 72, 717-730, 2014.

Websites