Vertical sun shades were placed on the outside of the Centre for Engineering Innovation Friday by a team consisting of a crane operator and construction workers on the ground and roof who carefully positioned the wood composite beams into slots attached to the building’s front.
Another Phase II milestone was reached Friday when the main steel staircase was installed in the building’s atrium area.