June 2022
May 2022
April 2022
Windsor Hall-Water Shutdown/Replacement of Water Meter, Friday, May 6, 2022, 8:00 a.m. - 10:00 a.m.
March 2022
February 2022
January 2022
Education Building - Access/Classroom 1101 Renovations, January 24-26, 2022, 7:00 a.m. - 11:00 a.m.
Essex Hall - Phase 2 - Stair Tower Set Up, January 14 to March 31, 2022, 8:00 a.m. - 4:00 p.m.
Education Building - Classroom 1101 - Fire Alarm Impairment, January 12, 2022, 8:00 a.m. - 4:00 p.m.
December 2021
November 2021
Windsor Hall-Elevator Shutdown/Shaft Floor Painting, November 19, 2021, 12:00 p.m. - 4:00 p.m.
October 2021
September 2021
Date Extension: St. Denis Fieldhouse - Floor Epoxy Sealing Repair Work, Friday, September 10, 2021, 8:30 a.m. - 2:00 p.m.
August 2021
St. Denis Fieldhouse - Fire Alarm System By-pass, August 5, 2021, 7:00 a.m. - 3:00 p.m.
July 2021
Essex Hall-Domestic Hot Water Shutdown/Valve Replacement, July 29, 2021, 8:00 a.m. - 12:00 p.m.
CAW Student Centre- Loading Dock Paving Replacement, July 22 - 30, 2021, 7:00 a.m. - 5:00 p.m.
Lambton Tower - Mansard Roof Painting and HVAC Shutdown, July 12 - 23, 2021
Lambton Tower-Mansard Roof Painting/Rooftop and Penthouse - July 5 - 30, 2021, 8:00 a.m. - 4:00 p.m.
Annual Fire Alarm Operations and Verification, July 26-30, 2021, 7:00 a.m. - 4:00 p.m.
Buildings Affected:
- Cartier Hall
- Alumni Hall
- Vanier Hall
- Campus Wide Elevators
Annual Fire Alarm Operations and Verification, July 19 - 23, 2021, 7:00 a.m. - 4:00 p.m.
Buildings Affected:
- Laurier Hall
- Residence Hall West (formerly MacDonald Hall)
Annual Fire Alarm Operations and Verification, July 12 - 16, 2021, 7:00 a.m. - 4:00 p.m.
Buildings Affected:
- Education Building
- Lambton Tower
- Erie Hall
- Biology Building
- 2629 Riverside Drive (Psychology)
- Chryler Hall Tower Complex
Annual Fire Alarm Operations and Verification, July 5 - 7, 2021, 7:00 a.m. - 4:00 p.m.
Buildings Affected:
- Essex Hall
- University Computer Centre
- Energy Conversion Centre
- Great Lakes Institute of Environmental Research
- Chemical Control Centre
June 2021
St. Denis Fieldhouse - Demolition of Bleachers/Fieldhouse Unusable, June 28 - July 9, 2021
Assumption Church Parking Lot-Closed for Maintenance Work, June 15, 2021, 7:00 a.m. - 7:00 p.m.
CAW Student Centre- B99 Law Temp Space Flood Restoration, June 14-30, 2021, 7:00 a.m. - 5:00 p.m.
SoCA Armouries, Fire Alarm Systems Operations and Verification, June 29, 2021, 9:00 a.m. - 1:00 p.m.
Annual Fire Alarm Operations and Verification, June 28 - July 2, 2021, 7:00 a.m. - 4:00 p.m.
Buildings Affected:
- Essex Centre of Research Building (CORe)
- Assumption Hall
- Leddy Library (East) Main Building
- Leddy Library West Wing
- Centre for Automotive Research and Education (CARE)
- Campus Hydrants
Essex Hall - Partial Roof Replacement, June 21 - September 1, 2021, 8:00 a.m. - 4:00 p.m.
CAW Student Centre- Loading Dock Paving Replacement, June 21- July 9, 2021, 7:00 a.m. - 5:00 p.m.
Annual Fire Alarm Operations and Verification, June 21 - 25, 2021, 7:00 a.m. - 4:00 p.m.
Buildings Affected:
- Jackman Dramatic Art Centre
- Medical Education Building
- Joyce Entrepreneurship Centre (JEC)
- Parking Garage
- Assumption Hall
Annual Fire Alarm Operations and Verification, June 14-18, 2021, 7:00 a.m. - 4:00 p.m.
Buildings Affected:
- CAW Student Centre
- Dillon Hall
- Stadium
- St. Denis Fieldhouse
- Faculty of Education Gym
Buildings Affected:
- Health Education Centre
- Leddy Library (East) Main Building
- Education Building
- Dillon Hall
- Alumni Hall
- CAW Student Centre
- Chrysler Hall North
- Chrysler Hall South
- Centre for Engineering Innovation
- Odette School of Business
- Cartier Hall
- Medical Education Building
Alumni Hall-New Fire System Booster Pump Installation, June 3, 2021, 7:00 a.m. - 4:00 p.m.
Annual Fire Alarm Operations and Verification, June 7 - 11, 2021, 7:00 a.m. - 4:00 p.m.
Buildings Affected:
- Centre for English Language Development
- Centre for Engineering Innovation
- Odette School of Business
- Welcome Centre
May 2021
-
Maintenance Building
-
Energy Conversion Centre
-
Central Refrigeration Plant
-
University Computer Centre
-
Memorial Hall
-
Lebel Building
-
Chemical Control Centre
April 2021
Erie Hall - Classroom 2123 Renovations, April 26 - September 5, 2021, 7:00 a.m. - 5:00 p.m.
Odette School of Business-Exterior Cleaning of the Facade, April 16-18, 2021, 8:00 a.m. - 11:59 p.m.
Education Building-Plumbing Work/Soldering/Fire Alarm Disable, April 9, 2021, 8:00 a.m. - 4:00 p.m.
Erie Hall-Inspection for Over-spray (HVAC -2nd Floor), April 1, 2021, 2:00 p.m. - 8:00 p.m.
March 2021
Leddy Library (East) Main-Archives Lighting Upgrades, March 17-24, 2021, 8:00 a.m. - 3:30 p.m.
Education Building - Asbestos Ceiling Tile Removal/Abatement, March 12, 2021, 8:00 a.m. - 4:00 p.m.
2629 Riverside Drive - Fire Alarm & Security Upgrades, March 1-4, 2021, 8:00 a.m. - 4:00 p.m.
February 2021
Alan Wildeman Centre of Creative Arts, Fire Alarm Testing, Tuesday, February 23, 2021, 8:00am-4:00pm
January 2021
Tunnel Area (Column #60)- Ceiling Area Patch Repairs, January 21-25, 2021, 7:00am-4:00pm
SoCA Armouries, Fire Alarm Systems Operations and Verification, January 26, 2021, 8:00am-4:00pm
Windsor Hall, Fire Alarm Systems Operations and Verification, January 29, 2021, 8:00am-4:00pm
Health Education Centre-Glass Doors Replacement, January 12, 2021, 7:30am-4:00pm
Chrysler Hall North and South - Inspection of Shelf Angle, January 5-8, 2021, 8:00am-4:00pm
December 2020
Leddy Library West Wing-Steam Outage/Leak Repair, December 15, 2020, 6:00am-2:00pm
Windsor Hall, Fire Alarm Systems Operations and Verification, December 22 2020, 8:00am-4:00pm
SoCA Armouries, Fire Alarm Systems Operations and Verification, December 22, 2020, 8:00am-4:00pm
Essex Hall--Basement Mechanical - Hot Water Heating Shutdown, December 14-18, 2020, 8:30am-4:30pm
St. Denis Fieldhouse-Fire Alarm System Testing, December 8, 2020, 8:00am-11:00am
Laurier Hall-Hot and Cold Water Shutdown-Valve Repairs, December 10, 2020, 8:00am-12:00pm
Leddy Library West Wing-Hot Water Shutdown Due to Water Leak, December 4-8, 2020, 3:00pm-4:00pm
Essex Hall-Pipe Leak Repair/Tile Removal, December 4, 2020, 8:00am-3:00pm
Windsor Hall, New Intercom Installation to the Entrance, December 2-7, 2020, 7:00am-5:00pm
November 2020
Essex Hall-Investigate and Repair Water Leak/Type II Enclosure, November 24-25, 2020, 12:00pm-4:00pm
Essex Hall-Investigate and Repair Water Leak/Type II Enclosure, November 24-25, 2020, 12:00pm-4:00pm
Date Extension: Essex Hall-Floor Drain Repair/Access to Ceiling, November 23-24, 2020, 7:30am-2:00pm
Laurier Hall-Emergency Hot and Cold Water Shutdown-November 20, 2020, 8:00am-2:00pm
Essex Hall-Floor Drain Repair/Access to Ceiling, November 23, 2020, 7:30am-2:00pm
Windsor Hall, Fire Alarm Systems Operations and Verification, November 27, 2020, 8:00am-4:00pm
SoCA Armouries, Fire Alarm Systems Operations and Verification, November 24, 2020, 8:00am-4:00pm
Vanier Hall-Steam Outage To Repair Steam Leak, November 10, 2020, 6:00am-2:00pm
Centre for Research Essex (CORe) Building - Air Compressor Repair, November 6, 2020, 1:00pm-4:00pm
Human Kinetics-Emergency Water Shutdown, November 2-3, 2020, 11:00am-6:00pm
October 2020
Alumni Hall-Control Valves Installation on Rooftop HVAC Units, October 26-28, 2020, 8:00am-5:00pm
Windsor Hall, Fire Alarm Systems Operations and Verification, October 30, 2020, 8:00am-4:00pm
SoCA Armouries, Fire Alarm Systems Operations and Verification, October 27, 2020, 8:00am-4:00pm
Odette School of Business/Lambton Tower-Steam Outage, October 16, 2020, 6:00am-2:00pm
Essex Hall-B03 Renovations/Hot Water Heating Shutdown, October 13, 2020, 8:30am-4:30pm
St. Denis Fieldhouse/Stadium-Power Shutdown to Clear Blockages-October 10, 2020, 7:00am-3:00pm
Centre for Engineering Innovation (CEI)-Fire Alarm Testing, October 6, 2020, 10:00am-2:00pm
Assumption Hall-Water Shutdown/Backflow Device Repair, October 1, 2020, 8:00am-12:00pm
September 2020
CAW Student Centre- Starbucks Cafe/Fire Alarm System Shutdown, September 30, 2020, 8:00am-4:00pm
Essex Hall-B03 Renovations/Hot Water Heating Shutdown, September 23-24, 2020, 8:30am-4:30pm
Lambton Tower-Mechanical Room Welding/Fire Alarm Watch-September 24, 2020, 8:00am-3:00pm
Assumption Hall-Water Shutdown/Backflow Device Testing, September 24, 2020, 8:00am-12:00pm
Lambton Tower-Pan Liner Installation/CS3 Shutdown-September 23-25, 2020, 8:00am-3:00pm
Windsor Hall, Fire Alarm Systems Operations and Verification, September 29, 2020, 8:00am-4:00pm
SoCA Armouries, Fire Alarm Systems Operations and Verification, September 29, 2020, 8:00am-4:00pm
Alumni Hall-Steam Outage/Steam Leak Repair, September 22, 2020, 11:00am-2:00pm
Centre for Engineering Innovation (CEI)-Tempered Water Shutdown, September 22, 2020, 8:00am-12:00pm
CAW Student Centre-Steam Outage to Repair Steam Leak, September 22-24, 2020, 7:30am-2:00pm
Chrysler Hall Tower-Intermittent Disruption in Air Flows, September 15-30, 2020, 7:30am-2:00pm
Jackman Dramatic Art Centre-Back Flow Maintenance, September 8,2020, 7:30am-3:30pm
Jackman Dramatic Art Centre-Back Flow Maintenance, September 4,2020, 12:30pm-3:30pm
Erie Hall-Removal of Ceiling Tiles Containing Asbestos, September 3, 2020, 8:00am-4:30pm
August 2020
Windsor Hall, Fire Alarm Systems Operations and Verification, August 28, 2020, 8:00am-4:00pm
SoCA Armouries, Fire Alarm Systems Operations and Verification, August 24, 2020, 8:00am-12:00pm
Assumption Hall-Chapel Roof Repairs, August 21, 2020, 8:00am-4:00pm
SoCA Armouries, Exterior Building Power Washing, August 28-30, 2020, 8:00am-4:00pm
Windsor Hall, Exterior Building Power Washing, August 27-30, 2020, 8:00am-4:00pm
CAW Student Centre- Starbucks Cafe/Power Shutdown, August 22, 2020, 8:00am-12:00pm
Dillon Hall-Backflow Prevention Work, August 19, 2020, 8:00am-12:00pm
Assumption Hall-Chapel Roof Inspection, August 19-20, 2020, 8:00am-4:00pm
CORe Building/Essex Hall-Nitrogen Gas-Vacuum Lines Relocation, August 13, 2020, 8:30am-1:30pm
Human Kinetics-Hoarding Installation for New Corridor, August 10, 2020-March 29, 2022, 8:00am-5:00pm
St. Denis Centre/Human Kinetics-Electrical Switchgear Mobilization, August 10, 2020, 10:00am-5:00pm
Alumni Hall-Alumni Threshold Removals & Suite Painting, August 4-31, 2020, 8:00am-5:00pm
Centre for Engineering Innovation (CEI)-Elevator Repairs, August 4-25, 2020, 8:00am-5:00pm
Odette School of Business-Replace Elevator Hydraulic Shaft, August 4-18, 2020, 7:30am-4:30pm
CAW Student Centre-Starbucks Cafe Renovations, August 8-September 30 2020, 7:00am-6:00pm
Law Building-Window Blind Removal, August 8-September 1, 2020, 8:00am-4:00pm
July 2020
Biology Building-No Hot or Cold Water Due to Repairs, July 31, 2020, 7:30am-2:00pm
Lambton Tower-Basement Mechanical Work Welding/Fire Alarm Watch, July 23, 2020, 8:00am-5:00pm
Campus Wide Asbestos Reassessment Inspections, July 21, 2020 - October 20, 2020, 4:45pm-7:00am
Erie Hall-Stairs Closed For Construction, July 14-September 30, 2020, 7:00am-5:00pm
St. Denis Fieldhouse/Human Kinetics/Stadium-Power Shutdown, Saturday, July 25, 2020, 7:00am-3:00pm
Windsor Hall, Annual Fire Alarm Systems Operations and Verification, July 22-23, 2020, 8:00am-4:00pm
Alumni Hall-Suite Doors Lockset Replacement, July 10, 2020, 8:00am-4:00pm
Leddy Library (East) Main Building-1101 Collaboratory Space Renovations, July 9, 2020, 7:00am-5:00pm
CAW Student Centre-Temporary Hot Water Shutdown, July 8, 2020, 8:00am-1:00pm
Laurier Hall- Elevator Inspections, July 8-9, 2020, 8:00am-5:00pm
Memorial Hall-Elevator Inspections, July 7, 2020, 8:00am-5:00pm
Assumption Hall-Elevator Inspections, July 6, 2020, 8:00am-5:00pm
June 2020
Health Education Centre-Elevator Inspections, June 29-30, 2020, 8:00am-5:00pm
Essex Hall-Raeon Renovations B03, June 29-September 1, 2020, 8:30am-4:30pm
CORe Building-Sprinkler System Servicing, June 24, 2020, 8:00am-4:00pm
SoCA Armouries, Annual Fire Alarm Systems Operations and Verification, June 30, 2020, 8:00am-12:00pm
Windsor Hall, Annual Fire Alarm Systems Operations and Verification, June 26, 2020, 8:00am-12:00pm
Lambton Tower-Flooring Removal (2nd Floor), June 22, 2020, 7:30am-4:00pm
Law Building-Law Temporary Facilities-Law Building Removals-June 24-26, 2020, 8:00am-4:00pm
Stadium-Alumni Field Turf Replacement, June 22-August 10, 2020, 8:00am-5:00pm
Chrysler Hall Tower-CHT Room 616 - Carpet Tile Installation, June 23-27, 2020, 8:00am-5:00pm
Alumni Hall-Roof Metal Cladding Repairs, June 17, 2020, 10:00am-4:30pm
Laurier Hall -Annual Fire Alarm Systems Operations and Verification, June 16, 2020, 11:00am-12:00pm
Assumption Church Parking Lot Closed for Line Painting/Repairs-June 16-18, 2020, 8:00am-5:00pm
Biology Building-Booster Pump Tie In/No Hot or Cold Water, June 11, 2020, 7:00am-4:00pm
CAW Student Centre, Marketplace Dining Hall Renovations, June 11, 2020, 8:30am-4:30pm
Vanier Hall-Law Temporary Facilities Renovations, Phase 2, June 9-August 31, 2020, 7:00am-7:00pm
Erie Hall (G135C Studio A)-Annual Safety Inspections, June 12, 2020, 7:30am-4:30pm
Lambton Tower-Elevators Out of Service for Necessary Repairs, June 8-12, 2020, 8:00am-4:30pm
Power Outage for Selected Buildings- Sunday, June 14, 2020, 6:00am-6:00pm
Cancelled: Power Outage for Selected Buildings- Saturday, June 13, 2020, 6:00am-6:00pm
Campus Wide Steam Outage, Friday, June 12 to Sunday, June 14, 2020, 12:00pm - 6:00pm
Biology Building-Back Flow Preventer Replacement/No Hot or Cold Water, June 4, 2020, 7:00am-4:00pm
Memorial Hall-Roof Replacement/HVAC Shutdown, June 5, 2020, 8:00am-11:00am
Lambton Tower-Basement Mechanical Work Welding/Fire Alarm Watch, June 3, 2020, 7:00am-5:00pm
Biology Building-Back Flow Preventer Replacement/No Hot or Cold Water, June 3, 2020, 7:00am-4:00pm
Annual Fire Alarm Systems Operations and Verification, June 22-26 2020, 7:00am-4:00pm
Buildings Affected:
- Alumni Hall
- Cartier Hall
- Vanier Hall
Annual Fire Alarm Systems Operations and Verification, June 15-19 2020, 7:00am-4:00pm
Buildings Affected:
- Laurier Hall
- Residence Hall West (formerly MacDonald Hall)
Annual Fire Alarm Systems Operations and Verification, June 8-12, 2020, 7:00am-4:00pm
Buildings Affected:
- Education Building
- Erie Hall
- Lambton Tower
- Biology Building
- Chrysler Hall Tower
May 2020
Lambton Tower-HVAC Shutdown-Asbestos Removal Work, May 25-29, 2020, 7:00am-6:00pm
Windsor Hall-Annual Fire Alarm Operations and Verification, May 29, 2020, 8:00am-12:00pm
SoCA Armouries-Annual Fire Alarm Operations and Verification, May 26, 2020, 8:00am-12:00pm
Odette School of Business-Cooling Tower Repair Work, May 25-30, 2020, 6:00am-6:00pm
CAW Student Centre-Multi-Faith Prayer Space Card Reader Replacement, May 26, 2020, 8:00am-5:00pm
Dillon Hall/Human Kinetics-Installation of Door Actuators, May 22, 2020, 8:00am-5:00pm
Chrysler Hall South-Stairwell Access for Lighting Repair, May 20-22, 2020, 7:00am-5:00pm
St. Denis Fieldhouse-Medium Voltage Cable Pull- May 18-August 28, 2020
Annual Fire Alarm Systems Operations and Verification, June 1-5, 2020, 7:00am-4:00pm
Buildings Affected:
- Essex Hall
- Energy Conversion Centre
- University Computer Centre
- Great Lakes Institute of Environmental Research
- Chemical Control Bell
Lambton Tower - HVAC Mechanical All Day Shutdown, May 14-19, 2020, 7:00am-7:00pm
University Computer Centre-Computer Centre Basement HVAC Investigation, May 20, 2020, 10:00am-2:00pm
University Computer Centre-UCC Lighting Replacement Investigation, May 14, 2020, 9:00am-12:00pm
Annual Fire Alarm Systems Operations and Verification, May 25-29, 2020, 7:00am-4:00pm
Buildings Affected
- CORe Building
- Memorial Hall
- Essex Hall (Chemical Control Centre)
- Assumption Hall
- Drama (Essex Hall)
- Leddy Library
- Centre for Automotive Research and Education (CARE)
Memorial Hall-Roof Replacement, May 14-June 30, 2020, 7:00am-11:00pm
Revised: Lambton Tower - G103 Supply Air Diffusers Installations, May 12, 2020, 8:00am-3:30pm
CAW Student Centre- - Marketplace Dining Hall Renovations, May 13-June 1, 2020, 7:00am-11:00pm
Leddy Library West Wing-Law Temporary Facilities Renovations, May 13-June 30, 2020, 7:00am-7:00pm
Centre for Research Essex (CORe) Building - Fume Hood Testing, May 12-14, 2020, 8:00am-4:00pm
Chrysler Hall South-Elevator Out of Service for Repairs, May 11-15, 2020, 9:00am - 4:00pm
Windsor Hall-Power Outage for Repairs and Testing, Thursday, May 14, 2020, 6:00am-2:00pm
SoCA Armouries-Power Outage for Repairs and Testing, Wednesday, May 13, 2020, 6:00am-2:00pm
Annual Fire Alarm Systems Operations and Verification, May 19-22, 2020, 7:00am-4:00pm
Buildings Affected:
- Assumption Hall
- Joyce Entrepreneurship Innovation Centre
- Parking Garage
- Human Kinetics
- HK Stadium
- Health Education Centre
Annual Fire Alarm Systems Operations and Verification, May 11-15, 2020, 7:00am-4:00pm
Buildings Affected:
- CAW Student Centre
- Dillon Hall
- Law Building
- Human Kinetics Building
- HK Stadium
- Faculty of Education Gym
Annual Fire Alarm Systems Operations and Verification, May 4-8, 2020, 7:00am-4:00pm
Buildings Affected:
- Centre for Engineering Innovation
- Odette School of Business
- Welcome Centre
April 2020
Annual Fire Alarm Systems Operations and Verification, April 27 - May 1, 2020, 7:00am-4:00pm
Buildings Affected:
- Maintenance Building
- Energy Conversion Centre
- Central Refrigeration Plant
- University Computer Centre
- Memorial Hall
- Chemical Control Centre
- Centre for English Language Development
- Lebel Building
Campus Wide-Emergency Generator Annual Testing and Inspections, April 20-May 29, 2020, 8:00am-4:00pm
Biology Building-Mould Remediation (Room 402/402A), April 9-17, 2020, 8:00am-4:00pm
Centre for Engineering Innovation (CEI)- Overhead Crane Repairs, April 15-16, 2020, 8:00am-4:00pm
Chrysler Hall Tower, Carpet Tile Installation (Room 620A), April 2-3, 2020, 8:00am-4:30pm
St. Denis Fieldhouse-Electrical Power and Lighting, April 2, 2020, 12:00pm-3:30pm
March 2020
Chrysler Hall Tower/North/South-Building Locked Until Further Notice, March 25, 2020, 11:00am
Cancelled: Lambton Tower-Heat Pumps Installations/HVAC Shutdown, March 24-25, 2020, 8:00am-2:00pm
Essex Hall-Removal of Wind Tunnel (Room 303), March 23-27, 2020, 7:00am-4:00pm
Centre for Research Essex (CORe) Building - Cooling Tower Drain, March 17-18, 2020, 8:00am-4:00pm
Centre for Engineering Innovation (CEI)-Overhead Crane Repair , March 16-17, 2020, 8:00am-5:00pm
Essex Hall-Period Fan Interruption M-33 Mechanical Room for Painting, March 17, 2020, 7:30am-4:00pm
Leddy Library West - Stair 3-1 CCTV Camera, March 12, 2020, 8:30am-4:30pm
Law Building-Sample Collection for Asbestos Analysis, March 9, 2020, 5:00pm-12:00am
Windsor Hall-New Security Camera and Distress Button Installations, March 5-10, 2020, 8:00am-5:00pm
LeBel Building/Essex Hall-Roof Repairs, March 4-13, 2020, 7:00am-4:00pm
Centre for Research Essex (CORe) Building - HVAC Repair, March 3, 2020, 9:00am-12:00pm
Alumni Hall-Fire Alarm System Upgrades, March 2-3, 2020, 8:30am-4:30pm
February 2020
Date Adjustment: Essex Hall-Vacuum Pump System Tie-ins, February 28, 2020, 8:00am-12:00pmEssex Hall-Vacuum Pump System Tie-ins, February 26, 2020, 8:00am-12:00pm
Dillon Hall-Painting West Stairwell, February 21-23, 2020, 8:00am-10:00am
Law Building-Hot Water Shut Off, February 19, 2020, 8:00am-4:00pm
Essex Hall-Vacuum Pump System, February 19, 2020, 8:00am-12:00pm
Lambton Tower-Pumps Removal/HVAC Shutdown, February 18-20, 2020, 8:00am-12:00pm
Lambton Tower-Mechanical Piping Removal/HVAC Shutdown, February 10-11, 2020, 4:00pm-9:00pm
Law Building-Building Assessments-February 5-7, 2020, 7:00pm-3:00am
Centre for Engineering Innovation (CEI)-Nano Fab Renovations, February 3-4, 2020, 7:00am-4:00pm
January 2020
Lambton Tower-Mechanical Piping Removal/HVAC Shutdown, January 28-30, 2020, 8:00am-12:00pm
Biology Building-326A & 326B Upgrades/Repairs to DD Mixing Box, January 22, 2020, 8:30am-1:00pm
Centre for Engineering Innovation-Painting Stair Treads, January 24-31, 2020, 8:00am-4:00pm
Leddy Library (East) Main Building-W100 Baby Changing Station, January 14, 2020, 8:00am-1:00pm
Biology Building-Biology 326A & 326B Upgrades-January 7, 2020, 7:30am-12:30pm
Asbestos Reassessment Inspections, January 2, 2020-April 1, 2020, 4:45pm-7:00am
Chrysler Hall Tower-HVAC Shutdown Due to 3rd Floor Ceiling Access, January 7-8, 2020, 4:30pm-10:00pm
December 2019
Chrysler Hall South-Fire Alarm Inspections, December 20, 2019, 8:00am-12:00pm
Biology Building-Water Interruption/Piping and Valving Installations, January 3, 2020, 8:00am-3:00pm
Vanier Hall-No Hot Water/Installation of Isolation Valve, December 19, 2019, 12:30pm-2:30pm
Memorial Hall-Electrical Service Disruption, December 15, 2019, 6:00am-11:00am
Library West - 1st Floor Bottle Filling Station & Water Cooler, December 19-20, 2019, 7:30am-4:30pm
Assumption Hall-Water Shutdown for 3rd Floor Washroom Repairs, December 10, 2019, 8:00am-9:30am
Essex Centre of Research Building (CORe)-Brief Water Interruption, December 6, 2019, 8:00am-9:00am
SoCA Armouries-Stairwell Closed, December 13, 2019, 7:30am-4:00pm
Chrysler Hall South-Fire Alarm Inspection, December 5, 2019, 8:00am-12:00pm
November 2019
Health Education Centre-AV Equipment Upgrade, December 5, 2019-January 5, 2020
Cancelled: SoCA Armouries-Stairwell Closed, November 29, 2019, 7:30am-4:00pm
Chrysler Hall Tower-Men's Washroom Partition Installation, November 28-29, 2019, 8:00am-4:00pm
Chrysler Hall South-Fire Alarm Inspection, November 20, 2019, 8:00am-12:00pm
Lambton Tower-G115 Water Leaks Investigation, November 11-15, 2019, 8:30am-4:30pm
Lancer Sport and Recreation Centre (LSRC) Project St. Denis Fieldhouse/Human Kinetics/Forge Fitness/Stadium-, November 11, 2019-March 31, 2022, 7:00am-5:00pm
Essex Hall-Lab 135 Renovations/HVAC Shutdown, November 4, 2019, 8:00am-12:00pm
October 2019
Essex Hall-Chemical Control Centre-Door Replacement, October 17, 2019, 8:00am-4:00pm
Biology Building-No Steam/Hot Water Due to Required Repairs, October 17, 2019, 6:00am-12:00pm
Chrysler Hall North-Installation of Audio Visual Equipment, October 15, 2019, 8:00am-4:00pm
Chrysler Hall North, Exterior South Doors Replacement, October 15, 2019, 7:00am-6:00pm
Assumption Hall-Building Audit Inspection, October 15-18, 2019, 9:30am-4:00pm
Contact Update: CORe Building-Life Safety Integration Systems Test, October 16, 2019, 10:00am-1:00pm
Essex Hall-Lab Renovations, October 1, 2019, 7:00am-8:00pm
Essex Hall-No Hot Water/No Steam, October 3, 2019, 6:00am-12:00pm
Biology Building-Water Shutdown for Valve Repairs, October 3, 2019, 7:30am-9:00am
CORe Building-Life Safety Integration Systems Test, October 16, 2019, 10:00am-1:00pm
September 2019
Alumni Hall-Generator Project-New Gas Service, September 30-October 1, 2019, 8:30am-4:30pm
SoCA Armouries Building-Chiller Verification of Operations, October 4, 2019, 7:30am-4:00pm
Education Gym-Fire Alarm Bell Testing, September 24, 2019, 7:30am-8:30am
Windsor Hall-Water Shutdown/Valve Replacement, September 27, 2019, 9:00am-1:00pm
Health Education Centre-Security Camera Installations, September 23-25, 2019, 8:00am-5:00pm
Essex Hall-North Passenger Elevator Out of Service for Repairs, September 23-27, 2019, 7:00am-4:00pm
Laurier Hall-Water Shutdown Due to Pump and Piping Leak Repair, September 16, 2019, 3:00pm-5:30pm
Assumption Hall-East Roof Shingle and Gutter Repairs, September 17-18, 2019, 8:00am-4:00pm
Windsor Hall-Interior Signage Installation, September 12, 2019, 9:00am-12:00pm
CORe Building-Installation of Chilled Water By-Pass Valve, September 18-20, 2019, 6:00am-6:00pm
August 2019
July 2019
Chrysler Hall Tower-HVAC Shutdown/After Hours Abatement Work, July 30-August 1, 2019, 4:00pm-7:00am
Joyce Entrepreneurship Centre-Security Upgrades, July 29-September 9, 2019, 7:00am-4:00pm
Cancelled: CORe Building-Installation of Control Valve and Sensors, July 31, 2019, 6:00am-6:00pm
Dillon Hall-Finish Painting of the East Stairwell, July 26-29, 2019, 6:00am-5:00pm
Chrysler Hall Tower-After Hours Abatement Work, July 19, 2019, 4:00pm-9:00pm
Dillon Hall-Painting of Main Stairs, July 20-21, 2019, 7:00am-5:00pm
Biology Building-Paint South Stairwell (1st Floor to Basement Only), July 20-21, 2019, 8:30am-3:00pm
Biology Building-Third Floor 326/327 Lab Renovations, July 22, 2019, 9:00am-12:00pm
Jackman Dramatic Art Centre-Water Not Available, July 25, 2019, 8:00am-10:00am
Alan Wildeman Building-Annual Fire Alarm Operations and Verifications, July 8, 2019, 8:00am-4:00pm
SoCA Armouries-Annual Fire Alarm Operations and Verifications, July 10-11, 2019, 8:00am-4:00pm
Erie Hall/Room 1118 and Adjacent Corridors-Fire Alarm Installations, July 8, 2019, 8:00am-12:00pm
Chrysler Hall South/Animal Quarters Lower Floor, Fire Alarm Shutdown, July 8, 2019, 7:00am-12:00pm
St. Denis Fieldhouse, Hoisting Down Material from Roof, July 5, 2019, 9:00am-12:00pm
Windsor Hall-Annual Fire Alarm Operations and Verifications, July 3, 2019, 8:00am-4:00pm
Armouries Building-Chilled Water System Shutdown, July 3, 2019, 7:30am-9:30am
Cancelled: Campus Wide - Temporary Gas Interruptions (Enbridge Gas) - July 29-August 19, 2019
Campus Wide - Accessibility Audit Inspections, July 2-9, 2019, 8:00am-4:30pm
Annual Fire Alarm Operations and Verification-July 15-19, 2019, 7:00am-4:00pm
Annual Fire Alarm Operations and Verification-July 8-12, 2019, 7:00am-4:00pm
Windsor Hall-Painting and Furniture Moves, July 2-15, 2019, 9:00am-4:00pm
Cancelled: Leddy Library West Wing-HVAC Shutdown/Asbestos Abatement, July 2-6, 2019, 5:00pm-9:00am
Chrysler Hall North-Limited Cooling in Classroom G133, June 26-July 2, 2019, 6:00am-6:00am
Revised Date: Campus Wide Steam Outage, Thursday, July 18 to Saturday, July 20, 2019, 12:00pm - 2:00pm
June 2019
Laurier Hall-No Hot Water Due to Hot Water System Improvements, June 28, 2019, 12:00pm-2:00pm
Chrysler Hall South-Water Leak Repairs/Isolation Valve Installations, June 27, 2019, 8:00am-10:30pm
Alumni Hall-Alumni Suite Doors Lockset Replacement, June 25-August 16, 2019, 8:00am-4:00pm
Cartier Hall-LED Lighting Upgrades, June 18-August 3, 2019, 8:30am-4:30pm
Alumni Hall-Fire Alarm Upgrades, June 18-August 16, 2019, 8:30am-4:30pm
Memorial Hall-Door Repairs/Main East Entrance Accesss, June 21, 2019, 12:00pm-4:30pm
Human Kinetics-Domestic Cold Water Shutdown, June 21, 2019, 8:00am-11:00am
Cancelled: Campus Wide Steam Outage, Thursday, June 27 to Saturday, June 29, 2019, 12:00pm - 2:00pm
Erie Hall-Painting Room G125, June 18, 2019, 8:00am-4:00pm
Revised Date: Leddy Library West Wing, 2nd and 3rd Floor Renovations, June 24-July 31, 2019, 8:00am-4:00pm
Cancelled: Leddy Library West Wing, 2nd and 3rd Floor Renovations, June 17-July 31, 2019, 8:00am-4:00pm
Biology Building-Piping and Valves Repairs, No Hot Water, June 13, 2019, 8:00am-12:00pm
Essex Hall-North Elevator Out of Service, June 6, 2019, 8:00am-4:00pm
Essex Hall-Electrical Out of Service in Mechanical Room (M09), June 8, 2019, 8:00am-4:00pm
Chrysler Hall North-Classroom G133- Limited Cooling Available, June 3-July 15, 2019, 6:00am-6:00am
Dillon Hall-No Steam/Heat Not Available in the Building, June 3-7, 2019, 6:00am-6:00am
Date Adjusted: SoCA Freedom Way-Roof Repair, June 4-5, 2019, 8:00am-4:00pm
Human Kinetics/Stadium/Alumni Hall-Building Electrical Out of Service, June 12, 2019, 4:00am-4:00pm
Essex Hall-Flooring Replacement of North Wing (3rd Floor), June 3-7, 2019, 8:00am-4:00pm
Power Outage for Selected Buildings- Saturday, June 1, 2019, 6:00am-6:00pm
May 2019
Essex Hall-Hot Water Upgrade Project-Steam Shutdown, May 24, 2019, 7:00am-12:00pm
Date Adjustment: SoCA Freedom Way-Roof Repair, May 28-29, 2019, 8:00am-4:00pm
Human Kinetics/St. Denis Fieldhouse-Electrical Out of Service, May 22, 2019, 6:00am-8:00am
Cancelled: SoCA Freedom Way-Roof Repair, May 23-24, 2019, 8:00am-4:00pm
Vanier Hall-Flooring Replacement, May 22-June 12, 2019, 1:00pm-7:00pm
Essex Hall/Education Building-Door Repairs (Mechanical Rooms), May 14-15, 2019, 8:00am-4:30pm
Alan Wildeman SoCA Freedom Way-Gas Shut Off to Entire Building, May 10-11, 2019, 8:00am-4:00pm
Education Building-Ceiling Tile Removal, May 9-10, 2019, 8:00am-9:00pm
Cancelled: Alan Wildeman SoCA Freedom Way-Gas Shut Off to Entire Building, May 7-8, 2019, 8:00am-4:00pm
Erie Hall-Classroom Renovations 1118 and 1st Floor Corridor, May 7-August 15, 2019, 8:00am-9:00pm
CORe Building- Laser Scanning, May 8, 2019, 12:00pm - 6:00pm
Alan Wildeman SoCA Freedom Way-Gas Shut Off to Entire Building, May 7-8, 2019, 8:00am-4:00pm
Campus Wide - Switch to Cooling Mode from Heating Mode, May 1 - October 1, 2019, 12:00pm - 12:00pm
Campus Wide Steam Outage, Friday, May 31 to Sunday, June 2, 2019, 2019, 12:00pm - 6:00pm
April 2019
Biology Building-Stairwell Repair, April 24-29, 2019, 8:00am-4:00pm
Education Building-Classroom Renovations Room 1124, 1126, 2227, April 29-May 29, 2019, 8:00am-9:00pm
SoCA Freedom Way-Gas Shut Off to Entire Building, April 30-May 1, 2019, 8:00am-4:00pm
Alumni Hall-Emergency Generator Project-Electrical Power Shutdown, April 29, 2019, 7:00am-7:00pm
Human Kinetics-Defective Valve Repair - Cold Water Affected, April 25, 2019, 8:00am-11:00am
Law Building-Cafe Area - Student Lounge Renovations, April 29-May 10, 2019, 8:00am-9:00pm
SoCA Armouries Building-Painters Tape Removal, April 23, 2019, 8:00am-3:00pm
Human Kinetics/St. Denis Fieldhouse/Stadium-Electrical Out of Service, May 4-5, 2019, 7:00am-5:00pm
Human Kinetics-HVAC Unit Out of Service for Entire Building, April 25-29, 2019, 7:00am-5:00pm
Human Kinetics-Basement HVAC Unit Out of Service, April 23, 2019, 7:00am-5:00pm
CORe Building-Heater Installation and Ceiling Replacement, April 18-26, 2019, 7:00am-4:00pm
Law Building-Emergency Pavement Repair, April 17-24, 2019, 10:30am-4:30pm
Laurier Hall-Roof Replacement, April 16-July 1, 2019, 7:00am-7:00pm
Alumni Hall-Emergency Generator Project-Generator Installation, April 18, 2019, 8:30am-12:00pm
Assumption Church Parking Lot Closed for Line Painting/Repairs-April 25-26, 2019, 8:00am-5:00pm
Revised Schedule: Alumni Hall-Emergency Generator Project, April 16-June 7, 2019, 8:30am-4:30pm
Centre for Engineering Innovation-First Floor Renovations, April 17-July 15, 2019, 6:00am-5:00pm
Parking Lot Clark V-Parking Lot Access Blocking Temporarily, April 11, 2019, 7:00am-4:00pm
Updated: Chrysler Hall Tower-Electrical Panel Upgrade, April 13, 2019, 8:00am-5:00pm
St. Denis Fieldhouse- Roof Hoisting Down of Material, April 8, 2019, 7:00am-12:00pm
Date Adjustment: Chrysler Hall Tower-Installation of Signage, April 5, 2019, 9:00am-1:00pm
Chrysler Hall Tower-Electrical Panel Upgrade, April 13, 2019, 8:00am-5:00pm
Human Kinetics/Alumni Hall-Electrical Out of Service, Thursday, April 4, 2019, 12:01am-9:00am
Chrysler Hall Complex (CHT/CHN/CHS)-Lighting Retrofit Project, April 1-18, 2019, 4:30pm-11:00pm
Memorial Hall/Education Building-Water Meter Replacement, April 24, 2019, 8:00am-12:00pm
Chrysler Hall Tower-Installation of Signage, April 4, 2019, 9:00am-1:00pm
Biology Building-Fumehood Calibration and Installation, April 29-May 3, 2019, 7:00am - 7:00am
March 2019
Joyce Entrepreneurship Centre-Elevator Out of Service, March 29, 2019, 8:00am-4:00pm
Human Kinetics-Fieldhouse Roof Hoisting of HVAC Units, March 26, 2019, 7:00am-1:00pm
Service Tunnel-Pipe Stanchion #249 Replacement, March 27-April 3, 2019, 7:00am-4:00pm
Law Building-Wall Repairs Due to Water Leak, March 21-22, 2019, 8:00am-4:00pm
Essex Hall/Leddy Library (West)/Memorial Hall-Exterior Cleaning, March 22-30, 8:00am-5:00pm
Biology Building-Third Floor 326/327 Lab Renovations, March 18-May 11, 2019, 8:00am-4:30pm
Human Kinetics-Fieldhouse Roof Hoisting of HVAC Units, March 26, 2019, 4:00pm-7:00pm
Cancelled: Human Kinetics-Fieldhouse Roof Hoisting of HVAC Units, March 22, 2019, 7:00am-11:00am
Health Education Centre-Plumbing Repairs-Main Water Supply Shut Off, March 22, 2019, 7:30am-9:00am
Health Education Centre-Plumbing Repairs-Main Water Supply Shut Off, March 22, 2019, 8:00am-4:00pm
Vanier Hall-Steps Repair on West Side, March 19-22, 2019, 8:00am-4:00pm
Human Kinetics-Fieldhouse Roof Hoisting of HVAC Units, March 13, 2019, 7:00am-12:00pm
Chrysler Hall North-HVAC Shutdown Due to Whiteboards Installation, March 20, 2019, 10:00am-11:30am
Human Kinetics-Pipe Repair-Hot Water Line Isolation, March 8, 2019, 8:00am-4:00pm
Education Building-Equipment Valve Repair-Main Cold Water Isolation, March 8, 2019, 8:00am-4:00pm
Human Kinetics-Fieldhouse Roof Hoisting of 1 HVAC Units, March 8, 2019, 7:00am-12:00pm
Jackman Dramatic Art Centre-CCTV Camera Installation, March 7-8, 2019, 8:00am-2:00pm
Human Kinetics-Roof Hoisting, March 4, 2019, 7:30am-12:00pm
Cancelled: Windsor Hall-Installation of Windsor Hall Sign-South Elevations, March 1, 2019, 8:00am-12:00pm
SoCA Armouries Building-MT-1 Panels Modifications/Grinding, March 1, 2019, 6:30am-9:00am
February 2019
Human Kinetics-Hot Water Heating Isolation For Tie-in, February 28, 2019, 7:00am-11:00am
Human Kinetics-Pool Closure for Chlorine Piping and Rerouting, February 25-28, 2019, 7:00am-4:30pm
Chrysler Hall Tower-Light Fixtures Replacing/HVAC Shutdown, February 21-22, 2019, 6:00pm-2:30pm
CORe Building- Load Bank Testing on Each Generator, February 19 and 21, 2019, 8:00am-4:00pm
Chrysler Hall Tower-HVAC Shutdown-Type 2 Drilling Procedures, February 21, 2019, 3:00pm-4:30pm
Centre for Engineering Innovation-Cold Water Supply Installation, February 20, 2019, 8:00am-12:00pm
Essex Hall-Elevator Testing, February 19-20, 2019, 7:30am-4:00pm
Assumption Hall-Domestic Hot Water Shutdown for Tank Repairs, February 8, 2019, 8:00am-4:00pm
Chrysler Hall Tower-HVAC Shutdown For Wall and Door Drilling, February 7, 2019, 3:30pm-7:30pm
CORe Building-Installation of Banners, February 7, 2019, 12:00pm-4:30pm
Chrysler Hall Tower-Ceiling Tiles Removal, February 3, 2019, 7:30am-2:30pm
Date Extension: CORe Building-Curtain Wall Fins Work, January 23-February 8, 2019, 8:00am-4:00pm
Biology Building-Lighting Panel Installation, February 2, 2019, 7:00am-3:00pm
Chrysler Hall Tower-Ceiling Tile Removal, February 2, 2019, 8:00am-4:00pm
Odette School of Business-Piping Repair-Hot Water Shutdown, February 2, 2019, 7:00am-12:00pm
CORe Building-Audio System Updates, February 5, 2019, 8:00am-4:00pm
January 2019
Leddy Library (East) Main and West Wing-Fire Alarm Verifications, January 30, 2019, 7:30am-8:00am
CORe Building-Vestibule Repair, January 28-February 1, 2019, 8:00am-4:00pm
Date Extension: CORe Building-Curtain Wall Fins Work, January 23-31, 2019, 8:00am-4:00pm
Time Adjustment: Cartier Hall-Fire Alarm Shutdown, January 25, 2019, 2:00pm-4:00pm
Semi Annual Inspections of the Fire Suppression Systems, January 28-30, 2019, 8:00am-4:00pm
Lambton Tower-Room 1100 Upgrades, January 23-February 15, 2019, 8:00am-4:30pm
CORe Building-Audio System and Cable Labelling Installation, January 25, 2019, 8:00am-4:00pm
CORe Building-Curtain Wall Fins Work, January 23, 2019, 8:00am-4:00pm
Chrysler Hall Tower-HVAC Shutdown, January 23, 2019, 3:00pm-11:00pm
Date Adjustment: Cartier Hall-Fire Alarm Shutdown, January 25, 2019, 8:00am-1:00pm
Chrysler Hall North-HVAC Shutdown/Whiteboards Installation, January 21, 2019, 9:30am-12:00pm
SoCA Building-Fire Alarm Relocation, January 22, 2019, 7:30am-2:00pm
Cartier Hall-Fire Alarm Shutdown, January 18, 2019, 8:00am-1:00pm
Chrysler Hall South-Elevator Out of Service for Repairs, January 11, 2019, 8:00am-4:00pm
Chrysler Hall Tower-HVAC System Shutdown, January 7-8, 2019, 3:00pm - 11:00pm
December 2018
Human Kinetics-Type I Asbestos Abatement, December 21, 2018, 7:00am-10:00am
Vanier Hall-Emergency Steam Shutdown, December 21, 2018, 6:00am-8:00am
Vanier Hall-Domestic Water Shutdown, December 21, 2018, 9:00am-5:00pm
Odette School of Business-Domestic Water Shutdown, December 21, 2018, 8:00am-12:00pm
Biology Building-Domestic Water Shutdown, December 21, 2018, 1:00pm-5:00pm
Update: St. Denis Centre Fieldhouse - HVAC Roof Hoist, December 20, 2018, 7:00am-3:00pm
Human Kinetics-Fieldhouse HVAC Roof Hoist, December 20, 2018, 7:00am-3:00pm
CAW Student Centre-Lighting Maintenance, December 17-20, 2018, 8:00am-4:00pm
Education Building-Domestic Hot Water Shutdown, December 14-22, 2018, 10:45am-4:00pm
Human Kinetics-2nd Floor Electrical Out of Service, December 28, 2018, 7:00am-5:00pm
Essex Hall-Corridor Floor Replacement, December 26, 2018 to January 4, 2019, 8:00am-4:00pm
Human Kinetics-Compressed Air Out of Service, December 14, 2018, 7:00am-10:00am
Human Kinetics-Steam Out of Service, December 13, 2018, 7:00am-4:00pm
Human Kinetics-Heating Hot Water Out of Service, December 12, 2018, 7:00am-11:00am
Centre of Research, Essex Building (CORe)-Domestic Water Shutdown, December 14, 2018, 7:00am-11:00am
Centre of Research, Essex Building (CORe)-Power Shutdown, December 14, 2018, 7:00am-8:00am
CORe (SRIF)/Essex Hall-Tunnel, Basement and Penthouse Insulation, December 1-2, 2018, 7:00am-5:00pm
Chrysler Hall North-G126 and G127 Upgrades, December 3-14, 2018
November 2018
Lambton Tower-Emergency Cold Water Shutdown, November 29, 2018, 2:30pm-4:00pm
Health Education Centre-Door Actuators Installation, November 28, 2018
Pitt Ferry Building-Second Floor Lighting Repairs, November 28, 2018, 8:00am-12:00pm
Dillon Hall-Elevator Out of Service, November 27, 2018, 8:00am-12:00pm
Parking Garage-East Elevator Out of Service, November 27, 2018, 12:00pm-4:00pm
Armouries Building-Frame Repairs to Performance Hall Door-November 26, 2018, 7:00am-12:00pm
Leddy Library West Wing-Asbestos Abatement Mechanical Room, November 22, 2018, 8:00am-12:00pm
St. Denis Fieldhouse-Power Outage to Update Electrical Equipment, November 24, 2018, 8:00am-5:00pm
Biology Building-Hot Water Piping Repairs in Animal Quarters Area, November 22, 2018, 7:30am-12:00pm
Leddy Library (East) Main and West Wing- Asbestos Abatement, November 17, 2018, 8:00am-4:00pm
Fieldhouse and Surrounding Areas-Photographs by Archaeologist, November 13, 2018, 11:00am-4:00pm
Assumption Hall-Main Gas Meter Replacement By Union Gas, November 16, 2018, 12:00pm-5:00pm
Essex Hall-Door Closure To Restrict Access To Construction Area, November 12-30, 2018, 7:00am-5:00pm
Leddy Library (East) Main Building-Pavement Repairs, November 9, 2018, 8:00am-4:00pm
Law Building-Office G109B Renovations, November 8, 2018, 8:00am-4:00pm
Essex Hall-North Stairwell Railing Painting, November 5-12, 2018, 10:00pm-4:00am
Science and Research Innovation Facility (SRIF)/Essex Hall-Vibration Study, November 1, 2018
Biology Building-Labs 201-205 Caps Isolation and Installation, November 2, 2018, 7:30am-9:00am
Essex Hall-Type II Glovebag Asbestos Abatement, November 2, 2018, 8:00am-5:00pm
October 2018
Leddy Library West Wing-Installation of Isolation Valves, October 31, 2018, 7:30am-8:30am
Cartier Hall-Suite 130 Renovations-Relocation of Sprinkler Heads, October 29, 2018, 8:00am-4:00pm
Alumni Hall-Emergency Generator Project, October 29, 2018 - March 29, 2019, 8:00am-4:30pm
Chrysler Hall Tower-1st Floor Renovations, October 25, 2018 to January 28, 2019, 8:00am-4:00pm
Assumption Hall-Chapel Roof Repairs, October 20-21, 2018, 8:00am-4:00pm
Chrysler Hall Tower-New Window Installations, October 17-31, 2018, 8:00am-5:00pm
Odette School of Business-Sprinkler Head Relocations, October 10, 2018, 8:00am-5:00pm
Leddy Library (East) Main Building-One Elevator Out of Service, October 10-12, 2018, 8:00am-4:00pm
Welcome Centre-Patching and Painting of Wall to 205, October 5, 2018, 8:30am-5:00pm
Biology Building-Asbestos Insulation Removal From Pipes, October 4, 2018, 7:30am-4:00pm
September 2018
Parking Garage-To Conduct Flood Test at the West Elevator Shaft, September 20, 2018, 5:00pm-6:30pm
Laurier Hall-Cabinet Re-facing and Countertop Replacement, September 17-26, 2018, 9:00am-5:00pm
Great Lakes Institute of Environmental Research-Ventilation, September 10-14, 2018, 7:00am-7:00pm
August 2018
Pitt Ferry Building-Generator Testing, Friday, August 31, 2018, 7:30am-12:30pm
Chrysler Hall Tower-Window Measuring, Saturday, September 8, 2018, 8:00am-5:00pm
Campus Wide-Catch Basin Cleaning, Monday, August 27, 2018, 7:30am-4:30pm
Cancelled: Essex Hall-Cement Work, August 20-24, 2018, 7:00am-5:00pm
Medical Education Building-Elevator Out of Service, Friday, August 24, 2018, 8:00am-5:30pm
Essex Hall-Cast Drain Line Repair/Electrical Outage on Rooms Listed, August 22, 2018, 8:00am-3:00pm
CANCELLED: Cartier Hall-Ramp Repairs and Restoration, August 20-September 21, 2018
Vanier Hall/University Computer Centre-Tunnel Repair, August 20-September 7, 2018
Parking Garage-Repairs and Painting, August 21-24, 2018, 8:00am-4:00pm
Essex Hall-Cement Work, August 20-24, 2018, 7:00am-5:00pm
CAW Student Centre-Water Shutdown To Repair Fire Hydrant, August 17, 2018, 8:00am-1:00pm
Laurier Hall-Elevators Out of Service, August 15, 2018, 8:00am-12:00pm
Vanier Hall-Flooring Replacement/Subdividing Room, August 13-31, 2018, 8:00am-5:00pm
Law Building-Main Elevator Out of Service For Repairs, August 2-8, 2018, 8:00am-4:00pm
Law Building-New Fibre and Data Cable Installation, August 7-9, 2018, 8:00am-5:00pm
Stadium-Painting of Guard Rails in Seating Area, August 2-6, 2018, 8:00am-5:00pm
July 2018
Human Kinetics-Room 118/119 Renovations, July 27-August 10, 2018, 8:30am-5:00pm
Assumption Hall-Air Conditioning Unit Replacement, July 30-August 31, 2018, 7:00am-7:00pm
Essex Hall-Drain and Catch Basin Repairs, July 27-August 3, 2018, 8:00am-4:00pm
Essex Hall-Glove Bag Removal of Asbestos Insulation, July 25, 2018, 7:00am-10:00am
Laurier Hall-Telus Antenna Upgrades, July 23-August 3, 2018, 7:00am-7:00pm
Chrysler Hall North-Campus Wireless Upgrades, July 23-August 7, 2018
Pitt Ferry Building-Repair Doors, July 16, 2018, 8:00am-3:00pm
DATE EXTENDED: Biology Building-Main West Stair Renovations, June 25-August 15, 2018, 7:30am-4:30pm
Cartier Hall-2018 Fire Alarm Upgrades, July 16-August 31, 2018
Assumption Hall-HVAC and Duct Mould Remediation (Basement and Chapel), July 18-August 17, 2018
REVISED: Essex Hall-Replacement of Ceiling Tiles, July 16, 2018, 4:00pm-9:00pm
REVISED: Essex Hall-Replacement of Ceiling Tiles, July 7, 2018, 7:00am-8:00am
SoCA Building-Triple Height Light Replacement, July 10-13, 2018, 7:00am-6:00pm
SoCA Building-Heritage Gate Installation, July 9-12, 2018, 7:00am-6:00pm
Essex Hall-Replacement of Ceiling Tiles, July 5, 2018, 7:00am-8:00am
REVISED: Biology Building-Main West Stair Renovations, June 25-July 23, 2018, 7:30am-4:30pm
REVISED: Campus Wide Steam Outage, July 6 - 8, 2018, 12:00pm - 6:00pm
CANCELLED: Campus Wide Power Outage, July 6, 2018, 6:00am - 6:00pm
REVISED: Campus Wide Steam Outage, July 6 - 8, 2018, 12:00pm - 6:00pm
REVISED: Campus Wide Power Outage, July 7, 2018, 6:00am - 6:00pm
Campus Wide Steam Outage, July 6 - 8, 2018, 12:00pm - 6:00pm
Campus Wide Power Outage, July 7, 2018, 6:00am - 6:00pm
June 2018
REVISED:Vanier Hall-HVAC Shutdown for Mould Remediation, June 25-29, 2018, 8:00am-4:00pm
Vanier Hall-HVAC Shutdown for Mould Remediation, June 25-29, 2018, 8:00am-4:00pm
Biology Building-Main West Stair Renovations, June 25-July 23, 2018, 7:30am-4:30pm
Cartier Hall-Fire Alarm System Verification and Testing, June 26, 2018, 8:00am-11:00am
Dillon Hall-North and South Stairwell Painting, June 23-24, 2018, 8:00am-6:00pm
Lambton Tower-Pipe Access Work, June 21, 2018, 8:00am-1:00pm
Biology Building-Fume Hood Testing and Calibration, June 25-July 6, 2018, 7:00am-7:00pm
Vanier Hall-Steel Pan Installations and Various Equipment Moves, June 19-July 6, 2018, 7:00am-7:00pm
Vanier Hall-Roof Replacement, Supplemental Notice, June 25-27, 2018, 1:00pm-4:00pm
Vanier Hall-HVAC Shutdown/Mould Remediation, June 19, 2018, 8:00am-5:00pm
Pitt Ferry Building-Sprinkler System Inspection, June 28, 2018, 7:00am-4:00pm
Pitt Ferry Building-Emergency Generator and Lighting Testing, June 22, 2018, 8:00am-12:00pm
All Parking Lots-Parking Lot Condition Assessments, June 19-20, 2018
Date Adjustment: Dillon Hall-Painting and Repair Work, June 12-14, 2018, 8:00am-7:00pm
Date Adjustment: Memorial Hall-Stairwell Painting and Repair, June 12-14, 2018, 8:00am-6:00pm
CAW Student Centre-Water Shutdown, June 14, 2018, 3:00pm-8:00pm
Campus Wide-Bell Payphone Removal, June 12-22, 2018, 9:00am-5:00pm
Memorial Hall-Stairwell Painting and Repair, June 9-10, 2018, 8:00am-6:00pm
Dillon Hall-Painting and Repair Work, June 9-10, 2018, 8:00am-6:00pm
Grounds Building-Door and Frame Painting, June 9-10, 2018, 8:00am-6:00pm
Chrysler Hall Tower-Wallpaper Replacement and Painting, June 11-15, 2018, 8:30am-4:30pm
Date Adjustment: Leddy Library (West)-Ceiling Repairs, June 15, 2018, 2:00pm-8:00pm
Dillon Hall-Accessible Door on West Side Out of Service Until Further Notice, June 6, 2018, 8:30am
Leddy Library (West)-Ceiling Repairs, June 7, 2018, 2:00pm-8:00pm
Assumption Hall-Basement Type II Asbestos Cleanup, June 6-30, 2018
Vanier Hall-Roof Replacement Phase 2, June 18-25, 2018
Stadium-Outdoor Stadium Field Lighting Inspection, June 11-24, 2018, 7:00am-4:00pm
May 2018
Assumption Hall-Cooling Interruption 3rd Floor, May 30-June 25, 2018, 7:00am-6:00am
Biology Building-Steam Supply Shutdown, May 26, 2018, 7:00am-4:00pm
Centre for Engineering Innovation-Empty Roof Drain, May 27, 2018, 7:30am-5:30pm
Erie Hall-Access Restriction Due to Water Leak/Abatement, May 28-31, 2018, 6:00am-11:30pm
Parking Garage-Elevator Inspections/Elevators Out of Service, May 29, 2018, 7:30am-5:30pm
Lambton Tower/Essex Hall/Education Building-Domestic Hot Water Restoration, May 22, 2018, 7:00am
Lambton Tower/Erie Hall-Domestic Hot Water Restoration, May 22, 2018, 6:00am
Pitt Ferry Building-Light Installation and Door Lubrication, May 21, 2018, 7:00am-12:00pm
Alumni Hall-Generator Project-Metering of Building Electrical Load, May 16-22, 2018, 12:30pm-12:30pm
Erie Hall-Classroom/Corridor Renovations and Abatement, May 17-June 15, 2018, 7:00am-10:00pm
Centre for Engineering Innovation-Roof Drainage, May 14, 2018, 7:30am-5:30pm
Leddy Library West Wing-Wood Door Replacement, May 14, 2018, 8:00am-5:00pm
Centre for Engineering Innovation-Excavation/Concrete Pad Installation, May 15, 2018, 8:00am-5:00pm
Bus Depot-Selective Interior Demolition, May 14-July 4, 2018, 7:00am-5:00pm
Leddy Library (East) Main and West Wing-Fire Alarm System Testing, May 11, 2018, 8:00am-9:00am
Leddy Library West-Hot Water System Flush, May 10-14, 2018, 7:30am-4:30pm
Assumption Hall-Basement Type II Asbestos Cleanup, May 14-18, 2018, 4:30pm - 7:00am
Pitt Ferry Building-Emergency Generator and Lighting Testing, May 31, 2018, 8:00am-12:00pm
Dillon Hall-Roof Inspection and Cleaning, May 8-9, 2018, 7:00am-5:00pm
Human Kinetics-Pavement Repairs, May 8-11, 2018, 8:00am-5:00pm
Medical Education Building-Water Shutdown in Washrooms on the Westside, May 7, 2018, 2:00pm-4:00pm
Chrysler Hall Tower-Lighting Retrofit/Type 2 Asbestos Abatement, May 7-9, 2018, 4:30pm-8:00am
Essex Hall-Concrete Stairs Repair, May 4-13, 2018
CAW Student Centre-Repair Concrete Steps, May 3-10, 2018 7:30am-5:30pm
Vanier Hall-Flush Hot Water System, May 2-3, 2018, 4:30pm-4:30pm
Former Music Building Site - Landscaping and Sidewalk Installation, May 2-June 30, 2018
School of Creative Arts-Signage Installation, May 4, 2018, 8:00am-5:00pm
CAW Student Centre-Signage Installation for the Hum Cafe, May 4, 2018, 8:00am-5:00pm
April 2018
Tunnel-Hand Rail Installation, April 27-May 2, 2018, 7:00am-5:00pm
Odette School of Business-Building Electrical, April 28, 2018, 6:00am-9:00am
Odette School of Business-Building Electrical, April 27, 2018, 6:00am-9:00am
Alumni Hall-Generator Project/Metering of Building Electrical Load, April 25-27, 2018, 9:00am-4:00pm
Campus Wide - Switch to Cooling Mode from Heating Mode, May 15 - October 1, 2018, 12:00pm - 12:00pm
Campus Wide-Roof Condition Assessments-Thermo-graphic Drone Scans, April 26-29, 2018
Music Building-Sunset Lane Closure (East of former Music Building Site), April 24-25, 2018
Various Buildings Across Campus-Hot Water Testing, April 23-27, 2018, 7:00am-9:00pm
Tunnel Repairs Near Biology Building-April 17-30, 2018, 7:00am-4:00pm
Pitt Ferry Building-Sprinkler System Inspection, April 27, 2018, 8:00am-12:30pm
Pitt Ferry Building-Fire Protection Monthly Inspections and Testing, April 27, 2018, 8:00am-12:00pm
Pitt Ferry Building-Emergency Generator and Lighting Testing, April 19, 2018, 8:00am-12:00pm
Essex Hall - Chemical Control Centre-Fumehood Inspections, April 17-22, 2018, 7:00am-9:00pm
Leddy Library (East) Main Building - Installation of New Panel, April 12-13, 2018, 7:00am-7:00pm
January 2018
Chrysler Hall North-Room Renovations, January 17-March 30, 2018, 8:00am-4:30pm
Music Building-Hazardous Material Survey, January 17-18, 2018
REVISED: Asbestos Reassessment Inspections, January 8, 2018-May 4, 2018, 4:45pm-7:00am
St. Denis Fieldhouse/Stadium-Geotechnical Exploration, January 25-31, 2018, 7:00am-6:00pm
Lambton Tower-Elevators Out of Service One at A Time, January 9, 2018, 8:45am-6:00pm
Parking Garage-East Elevator Back In Service/West Elevator Out of Service, January 8, 2018
Erie Hall-Flooring and Step Repairs, January 8-10, 2018, 8:00am-6:00pm
Asbestos Reassessment Inspections, January 8, 2018-March 9, 2018, 4:45pm-7:00am
December 2017
REVISED: Lambton Tower-Basement OOL/CTL Renovations, December 1, 2017 to January 5, 2018, 7:00am-4:30pm
REVISED: Library Main and West Building -Fire Alarm System Upgrades, October 12, 2017 to February 16, 2018
CANCELLED: Dillon Hall-West Side Entrance Door and Frame Replacement, December 21-22, 2017, 8:00am-4:00pm
DATE REVISED: CAW Student Centre/Human Kinetics-Service Tunnel and Loading Dock Repairs, December 21, 2017-January 2, 2018
DATE REVISED: Erie Hall-Fire Proofing Evaluation, December 21, 2017, 4:30pm-8:30pm
Dillon Hall-West Side Entrance Door and Frame Replacement, December 21-22, 2017, 8:00am-4:00pm
CAW Student Centre-Water Shutdown, December 21, 2017, 4:00pm-9:00pm
Erie Hall-Fire Proofing Evaluation, December 19, 2017, 4:30pm-8:30pm
Chrysler Hall North-Elevator on Service Mode, December 13-15, 2017, 9:00am-4:00pm
Lambton Tower-Elevator Modifications, December 14-18, 2017, 8:00am-5:00pm
Lambton Tower-Basement OOL/CTL Renovations, December 1, 2017 to January 31, 2018, 8:00am-4:30pm
November 2017
Biology Building-Partial Electrical Shutdown, November 25, 2017, 7:00am-4:00pm
Chrysler Hall Tower-Emergency Water Shutdown, November 22, 2017, 4:00pm-6:00pm
Leddy Library (West Wing)-Suite 100 Door Upgrades, November 21-December 10, 2017, 7:30am-4:30pm
REVISED: Erie Hall/Leddy Library (East) Main Building-Banners Replacement, November 21, 2017, 8:00am-5:00pm
Biology Building-Emergency Steam Repair, November 18, 2017, 6:00am-12:00pm
Biology Building-Guard Railing Installation, November 20-24, 2017, 7:00am-5:00pm
Chrysler Hall North-Renovations Area Update, November 20-December 8, 2017, 8:00am-4:30pm
Biology Building-Partial Electrical Shutdown, November 19, 2017, 7:00am-4:00pm
Biology Building-Domestic Hot and Cold Water Shutdown, November 18, 2017, 7:00am-4:00pm
Education Building-Electrical Work for Door Actuators, November 20, 2017, 8:00am-12:00pm
Pitt Ferry Building-Irrigation System Winterization, November 17, 2017, 12:00pm-5:00pm
Erie Hall/Leddy Library (East) Main Building-Banners Replacement, November 17, 2017, 8:00am-5:00pm
REVISED: Chrysler Hall North-Type 2 Removal of Plaster Window Bulkheads, November 13-15, 2017, 9:00am-5:00pm
Lambton Tower-Installation of Pre-Fabricated Walls, November 16-17, 2017, 8:30am-4:30pm
Chrysler Hall North-Type 2 Removal of Plaster Window Bulkheads, November 13-14, 2017, 9:00am-5:00pm
Vanier Hall-Power and Data Installation, November 15-December 15, 2017, 8:00am-5:00pm
REVISED: Maintenance Building-Walk-thru to Identify Fire Alarm Devices, November 16, 2017, 8:30am-4:00pm
REVISED: Campus Wide-Roof Condition Assessments-November 9, 2017 to April 1, 2018
REVISED: Human Kinetics/Field House-Roof Repairs, November 13-December 20, 2017
Assumption Hall-Contractor Site Review, November 9, 2017, 1:00pm-2:00pm
Assumption Hall-Walkways and Railings Installations, November 7-December 22, 2017, 8:00am-5:00pm
Lambton Tower/Erie Hall-Domestic Cold Water Shutdown, November 4, 2017, 8:00am-12:00pm
Great Lakes Institute of Environmental Research-Fire Alarm Shutdown, November 2, 2017, 8:00am-4:00pm
Assumption Hall-Contractor Site Review, November 2, 2017, 10:00am-11:00am
Chrysler Hall North-Painting of Rooms and Corridors, November 2-December 1, 2017, 8:00am-4:30pm
Campus Wide-Roof Condition Assessments-November 1, 2017 to April 1, 2018
Asbestos Reassessment Inspections, November 6, 2017-March 20, 2018, 8:00am-8:00pm
Human Kinetics-Roof Repairs, November 1-22, 2017, 7:00am-7:00pm
October 2017
DATE REVISED: Centre for Engineering Innovation-Walk-thru to Identify Fire Alarm Devices, October 30-31, 2017, 8:30am-4:00pm
Human Kinetics/Field House-Roof Repairs, Aggregate Removal, October 19-20, 2017, 7:00am-5:00pm
Human Kinetics-Main Entrance Removal and Reseal of Caulking, October 21, 2017, 8:00am-4:00pm
Erie Hall-Computer Science Lab 3127 Upgrades, October 17-November 3, 2017, 7:00am-5:00pm
Alumni Hall-Roof Repairs, October 17-November 30, 2017, 8:00am-5:00pm
Maintenance Building-Walk-thru to Identify Fire Alarm Devices, October 20, 2017, 8:30am-4:00pm
Laurier Hall-Valve Repair and Switch Over, October 17-20, 2017, 6:00am-4:00pm
CAW Student Centre-Wireless Door Module Installations, October 13, 2017, 8:00am-4:00pm
Biology Building-Emergency Repair - Steam Shutdown, October 13, 2017, 6:00am-2:00pm
Memorial Hall-Emergency Repair - Steam Shutdown, October 12, 2017, 6:00am-2:00pm
Odette School of Business-Main Elevator Out of Service, October 11-13, 2017, 4:30pm-4:30pm
Library Main and West Building -Fire Alarm System Upgrades, October 12, 2017 to February 7, 2018
Energy Conversion Centre-Roof Replacement/Aggregate Removal, October 12, 2017, 7:00am-4:30pm
Parking Garage-East Elevator Back In Service, October 10, 2017
Parking Garage- Elevators Out of Service Until Further Notice, October 10, 2017
Biology Building/Chrysler Hall South-Electrical Work for Stage 4, October 10-17, 7:00am-5:00pm
Alumni Hall-Venting System Repairs, October 4, 2017, 10:00am-2:00pm
Vanier Hall-Roof Replacement/HVAC Shutdown, October 10-12, 2017, 7:30am-7:30am
Chrysler Hall South-Classrooms 51 and 53 AV Installations, October 6-15, 2017, 8:00am-5:00pm
Main Campus Quad-Installation of Campus Walkway Lighting, October 2-5, 2017, 7:00am-5:00pm
September 2017
Human Kinetics, Front Entrance Door Repairs, September 29, 2017, 8:00am-5:00pm
Lambton Tower/Erie Hall-Room 1110-1112 Upgrades, September 26-29, 2017, 8:00am-5:00pm
Alumni Hall-Venting System Repairs, September 26-27, 2017, 6:00am-2:00pm
Human Kinetics-Electrical Work for Door Actuators, September 22, 2017, 8:00am-4:00pm
Parking Garage Repairs, September 21-22, 2017, 8:00am-7:00pm
Education Building-Mold Remediation Room 1127, September 19-21, 2017, 8:00am-5:00pm
Periodic Closure of Seating Pods Along Turtle Island Walk-September 18-20, 2017, 7:00am-5:00pm
Education Building-Lower Roof Replacement, September 16-17, 2017, 8:30am-4:30pm
Essex Hall-Power and Data Outlet Installation, September 14-15, 2017, 8:00am-5:00pm
Leddy Library (East) Main Building-Elevator Out of Service, September 11-12, 2017, 8:00am-4:00pm
Human Kinetics-Flow Switch Replacement, September 12, 2017, 6:00am-2:00pm
Alumni Hall-Control Valve Replacement, September 12, 2017, 7:00am-2:00pm
Parking Lot Line Painting, September 8-10, 2017, 6:00am-3:00pm
LeBel Building/Music Building-Tile Replacement and Paint Work, September 1-4, 2017, 4:30pm-7:00pm
Lambton Tower-Electrical Work, September 6, 2017, 8:30am-4:00pm
Vanier Hall-Roof Replacement, September 7-November 3, 2017, 7:00am-7:00pm
August 2017
LeBel Building-Replace Ceiling Tiles, August 31-September 1, 2017, 8:00am-5:00pm
Odette School of Business-Hot Water Booster Pump Replacement, August 29-30, 2017, 8:00am-4:00pm
Education Building-Roof Replacement Ph2, August 28-September 30, 2017, 8:30am-4:30pm
Law Building-Fire Alarm Shutdown for Door Hardware Upgrades, August 29, 2017, 8:30am-10:30am
Vanier Hall-Repair Heaving Floor Tiles, August 28-30, 2017, 9:30am-4:30pm
Essex Hall-Fumehood Control Valve Replacement, August 29-31, 2017, 7:00am-2:00pm
Human Kinetics-Valve and Coil Replacement, August 29-31, 2017, 7:00am-2:00pm
Turtle Island Walkway-Aluminum Flag Installations, August 29, 2017, 8:00am-5:00pm
Assumption Hall-Roof Replacement, West Face, August 28 - September 29, 2017, 8:30am-4:30pm
DATE EXTENDED: Education Building-Roof Replacement Ph1, Aggregate Removal, August 28 - September 1, 2017, 8:30am-4:30pm
Chrysler Hall North-Air Conditioning Shutdown, August 28-31, 2017, 7:00am-4:30pm
Assumption Hall-Barrier Free Access Ramp Installation, August 28-October 25, 2017, 8:00am-5:00pm
Education Building-Roof Replacement, August 28, 2017, 8:30am-4:30pm
Biology Building-East Side Angled Walkway Renovation, August 28-September 1, 2017, 7:00am-5:00pm
Chrysler Hall South-Electrical Feeds Installation, August 24-September 8, 2017, 7:00am-5:00pm
Emergency Water Shutdown-August 18, 2017, 11:00am-5:00pm
DATE EXTENSION: Installation of Signs and Sign Bases-August 26-September 1, 2017, 7:00am-5:00pm
Chrysler Hall South-Temporary Closure of Corridor on Lower Level, August 18-25, 2017, 7:00am-11:00pm
Education Building-Stair Delineation Installation, August 18, 2017, 7:00am-5:00pm
Lambton Tower-Removal of Concrete Floor By East Entrance, August 17, 2017, 8:00am-5:00pm
Education Building-Electrical Work for Door Actuators, August 15-16, 2017, 8:00am-4:00pm
Fire Alarm Operations and Verifications, August 14-18, 2017, 7:00am-4:00pm
Main Quad-Outside Lighting Installation, August 15-18, 2017, 8:00am-5:00pm
Dillon Hall-Lower Level Renovations, August 23-December 1, 2017, 7:00am-3:30pm
Campus Parking Lot Repairs, August 8-14, 2017, 8:00am-6:
Biology Building-Closure of Accessible Ramp, August 8-10, 2017, 7:00am-5:00pm
Alumni Hall - Exterior Masonry Repairs, August 8-September 8, 2017, 7:00am-5:00pm
July 2017
Law Building-Door Hardware and Accessibility Upgrades, August 4, 2017, 8:30am-10:00am
DATE EXTENSION: Chrysler Hall South and North-Replace Ceiling Tiles, July 28-August 2, 2017, 9:00am-7:00pm
DATE EXTENSION: Memorial Hall/Education Building-Ceiling Tiles Replacement, July 26-August 3, 2017, 10:00am-7:00pm
DATE EXTENSION: Biology Building-Ceiling Tiles Replacement, July 27-August 3, 2017, 11:00am-7:00pm
Human Kinetics-Electrical Work for Door Actuators, August 2-16, 2017, 8:00am-4:00pm
CANCELLED: Lambton Tower-Fire Alarm Shutdown, July 29, 2017, 8:00am-4:00pm
Biology Building-Ceiling Tiles Replacement, July 27-28, 2017, 11:00am-7:00pm
ABATEMENT POSTPONED: Science and Research Innovation Facility (SRIF) Project - Type III Abatement in North/West Areas of Essex Hall, July 28-August 18, 2017, 7:00am-5:30pm
DATE ADJUSTMENT: Great Lakes Institute of Environmental Research-No Air Conditioning, July 28-30, 2017, 6:00am-4:00pm
Chrysler Hall South-Replace Ceiling Tiles, July 28, 2017, 9:00am-5:00pm
Biology Building-Ceiling Tiles Replacement, July 27, 2017, 11:00am-7:00pm
Memorial Hall/Education Building-Ceiling Tiles Replacement, July 26, 2017, 10:00am-7:00pm
DATE EXTENSION: Science and Research Innovation Facility (SRIF) Project – Construction of Tunnel Connection, June 21 - August 17, 2017, 7:00am-6:00pm
Fire Alarm Operations and Verifications, August 8-11, 2017, 7:00am-4:00pm
Fire Alarm Operations and Verifications, July 31-August 4, 2017, 7:00am-4:00pm
Campus Roofing Upgrades-Contractor Pre-Bid Walk-Thru, July 26, 2017, 9:00am-1:00pm
Pitt Ferry Building-West Side Exterior Gate Painting, July 24-25, 2017, 8:00am-5:00pm
Pitt Ferry Building-Centre Stairwell Repairs, July 24, 2017, 7:00am-1:00pm
Chrysler Hall South-Abatement in Classrooms 51, 53 and Corridor, July 27-29, 2017, 3:00pm-11:00pm
Installation of Signs and Sign Bases-July 26-August 25, 2017, 6:00am-6:00pm
Inspection and Testing of High Voltage Cables in Tunnels-July 26-28, 2017, 8:00am-3:00pm
CANCELLED: Energy Conversion Centre/Cogeneration Unit-Power Outage-July 31, 2017, 9:00am-12:00pm
Power Outage-July 30, 2017, 8:00am-12:00pm
CANCELLED: Vanier Hall-Domestic Water System Shutdown, July 25, 2017, 4:00pm-8:00pm
University Computer Centre-Fire Alarm Operations and Verifications, July 24, 2017, 7:00am-8:00am
Biology Building-Water Shutdown for Backflow Preventer Installation, July 29, 2017, 7:00am-5:00pm
Chrysler Hall Tower Complex-Faulty Water Meter Replacement, July 18, 2017, 9:45am-3:00pm
CAW Student Centre-Painting Student Health Services, July 17-28, 2017, 3:30pm-11:59pm
Alumni Hall-Interior Repairs and Painting, July 18-September 1, 2017, 7:00am-6:00pm
Odette School of Business-Lower Level Women’s Washroom Shutdown, July 17, 2017, 7:00am-6:00pm
Assumption Hall-Air Conditioning Unit Shutdown for Repairs, July 13-20, 2017, 8:30am-4:30pm
Chrysler Hall South-Classroom Renovations, July 17-September 1, 2017, 8:00am-5:00pm
Clark Lot (Formerly Lot 'V')-Tree Removal, July 11, 2017, 9:00am-3:30pm
Campus Wide - Emergency Generator Testing, July 17-21, 2017, 8:00am-5:00pm
Chrysler Hall Tower-Water Shutdown to Repair Leaks and Service Valves, July 12, 2017, 4:30pm-10:00pm
Lambton Tower-Painting and Flooring Work on 6th and 7th Floors, July 10-31, 2017, 7:30am-4:00pm
Lambton Tower-Access to Ceiling Space on 5th Floor to Cap-off Ductwork, July 8, 2017, 7:00am-3:30pm
Parking Lot Q-Periodic Closure of the West Entrance (Sunset Avenue), July 12-21, 2017, 7:00am-5:00pm
Centre for Engineering Innovation-Installation of Roof Pavers, July 7-21, 2017, 8:30am-4:30pm
Facilities Condition Assessment with VFA, July 4-7, 2017, 7:00am-4:00pm
Fire Alarm Operations and Verifications, July 24-28, 2017, 7:00am-4:00pm
Fire Alarm Operations and Verifications, July 17-21, 2017, 7:00am-4:00pm
Centre for Engineering Innovation-Tree Trimming, July 7, 2017, 7:00am-3:30pm
Fire Alarm Operations and Verifications, July 10-14, 2017, 7:00am-4:00pm
Assumption Hall-Cleaning and Maintenance of Air Conditioning Units, July 4-11, 2017, 8:30am-4:30pm
Fire Alarm Operations and Verifications, July 4-7, 2017, 7:00am-4:00pm
Chrysler Hall South-Type 2 Enclosure, July 6, 2017, 7:00am-5:00pm
Vanier Hall/Cartier Hall-Vanier Circle Repaving, July 4-August 21, 2017, 8:00am-6:00pm
June 2017
Memorial Hall-Removal of Ivy from Building, July 3-14, 2017, 7:00am-4:00pm
Pitt Ferry Building-Outside Wall Inspection, June 28, 2017, 6:00am-2:00pm
Assumption Hall-Contractors Site Visit and Tour, June 27, 2017, 11:30am-12:30pm
St. Denis Fieldhouse-Cooling Tower Repair, June 26, 2017, 7:30am-3:00pm
Lambton Tower-Steam Coil Removal, June 26, 2017, 7:30am-3:00pm
Alumni Hall-No Hot Water for the Day, June 26, 2017, 7:30am-3:00pm
DATE REVISED: Lambton Tower-Cap-off Ductwork on 6th Floor, June 24, 2017, 7:00am-3:30pm
Parking Garage-Replace Door on Level 7A, June 27, 2017, 8:30am-4:00pm
Human Kinetics-Door Closer Replacement, June 21, 2017, 9:00am-12:00pm
Dillon Hall-HVAC Repair, June 19-22, 2017, 6:00am-2:00pm
Pitt Ferry Building-Outside Wall Inspection, June 20, 2017, 6:00am-2:00pm
Lambton Tower-Cap-off Ductwork on 6th Floor, June 20-21, 2017, 8:00am-4:00pm
All Campus Buildings-Emergency No Steam or Chilled Water Until Further Notice
CAW Student Centre-Installation of Emergency Phone in Elevator, June 14, 2017, 7:00am-6:00pm
Essex Hall-Shutdown of HV8, June 13, 2017, 6:00am-10:00am
Education Building-Electrical Breaker Replacement, June 11, 2017, 7:00am-10:00am
Odette School of Business-Leak Repairs at Penthouse, June 8-9, 2017, 8:00am-5:00pm
Service Tunnels-Installation of Storm Sumps Upgrades, June 12-July 30, 2017, 7:00am-7:00am
Essex Hall-Painting of Room B88-1 and Adjacent Office, June 7-9, 2017, 7:00am-2:00pm
Domestic Hot Water Shutdown-June 9-12, 2017, 9:00am-8:00am
Essex Hall-Domestic Hot Water System Flush, June 9-12, 2017, 2:00pm-8:00am
Odette School of Business-Classroom 104 Renovations, June 9-September 1, 2017, 8:00am-5:00pm
Pitt Ferry Building-Emergency Generator and Lighting Inspections, June 22, 2017, 8:00am-12:00pm
Law Building-Building Walk-Thru to Identify Fire Alarm Devices, June 13-15, 2017, 9:00am-4:00pm
REVISED: Campus Wide Power Outage, June 17, 2017, 6:00am - 6:00pm
Campus Wide Steam Outage, June 16-18, 2017, 12:00pm - 10:00pm
May 2017
Essex Hall-Sewer Line Re-construction, May 30-June 9, 2017, 6:00am-4:00pm
Lambton Tower-Abatement Work on the 6th and 7th Floors, May 30-June 23, 2017, 7:30am-5:00pm
Pitt Ferry Building-Installation and Repair Work, May 29-June 2, 2017, 8:00am-5:00pm
Essex Hall-Water Inspections, May 26-28, 2017, 8:00am-4:00pm
REVISED: Erie Hall-Banner Installation, May 29, 2017, 8:00am-5:00pm
Dillon Hall-Building Walk-Thru to Identify Fire Alarm Devices, May 30-31, 2017, 9:00am-4:00pm
DATE REVISED: Chrysler Hall Tower/Chrysler Hall South-Floor Repairs, May 24, 2017, 8:00am-6:00pm
DATE REVISED: Biology Building-Stair Tread Repairs, May 24, 2017, 8:00am-4:00pm
Law Building/Vanier Hall-Domestic Hot Water System Flush, May 19-22, 2017, 6:00am-2:00pm
Centre for Engineering Innovation-Roof Cleaning, May 23, 2017, 8:00am-4:00pm
Psychology Centre- 336, 348 and 326 Sunset Avenue, May 23-June 30, 2017, 7:00am-5:00pm
Education Building-Replace Door Hardware, May 17-18, 2017, 9:00am-7:00pm
Lambton Tower-Filter Element Replacement, May 22-26, 2017, 6:00am-4:00pm
Vanier Hall-Domestic Hot Water Shutdown, May 9-23, 2017
Facilities Condition Assessment with VFA, May 23-June 2, 2017, 7:00am-4:00pm
Human Kinetics-Flush Hot Water System, May 9-12, 2017, 1:00pm-11:59pm
Leddy Library West Wing-Asbestos Abatement and Valve Removal, May 10, 2017, 6:00am-2:00pm
Essex Hall-Shutdown of Airhandling Unit (HV8), May 9, 2017, 7:00am-10:00am
Assumption Church Parking Lot Closed for Line Painting-May 7, 2017, 7:00am-1:00pm
DATE EXTENSION: Chrysler Hall South-Temporary Closure of Northwest Building Exit, May 1-12, 2017, 8:00am-4:00pm
Lambton Tower/Erie Hall-Hot Water System Flush, May 7, 2017, 6:00am-6:00pm
Dillon Hall-Hot Water System Flush, May 5, 2017, 6:00am-6:00pm
Essex Hall-Shutdown of Airhandling Unit (HV8), May 3, 2017, 10:00am-12:00pm
Pitt Ferry Building-Emergency Generator, May 26, 2017, 8:00am-11:00am
Dillon Hall/Chrysler Hall South-Flooring Repairs, May 5, 2017, 8:00am-5:00pm
Erie Hall-Replace Floor Tiles at Stairwell Landing and Room 5104, May 3, 2017, 8:00am-5:00pm
Jackman Dramatic Art Centre-Floor Repair in Room 110, May 3, 2017, 8:00am-5:00pm
Biology Building-Room 122, Electrical Work for AV Upgrades, May 2, 2017, 8:30am-4:00pm
Campus Thermo-graphic Drone Scanning of Building Walls and Rooftops, May 6-7, 2017
Biology Parking Lot-Construction of the River Commons, May 8-September 29, 2017, 7:00am-5:00pm
Chrysler Hall South-Temporary Closure of Northwest Building Exit, May 1-8, 2017, 8:00am-4:00pm
Laurier Hall-Fire Alarm Assessments, May 16-18, 2017, 9:00am-4:00pm
Alumni Hall-Fire Alarm Assessments, May 2-4, 2017, 9:00am-4:00pm
Residence Hall West (formerly MacDonald Hall)-Fire Alarm Assessments, May 9-11, 2017, 9:00am-4:00pm
April 2017
DATE REVISED: Assumption Church Parking Lot Closed-April 28, 2017, 8:00am-8:00pm
UPDATED: CAW Student Centre-Fire Alarm Testing, April 24-26, 2017, 7:30am-4:00pm
Assumption Hall-Survey for Accessible Ramp Design, April 26, 2017, 7:00am-4:00pm
Education Building-Window Washing, April 25-27, 2017, 7:00am-4:00pm
Biology Building-Exhaust Fan Shutdown, April 25-27, 2017
Tunnel Water Testing-April 28-May 1, 2017, 6:00am-2:00pm
Assumption Hall-Minor Construction Work in Office 305 and 307, April 24-27, 2017, 9:00am-12:00pm
Assumption Church Parking Lot Closed-April 30-May 1, 2017, 8:00am-5:00pm
North of the Odette Building-Installation of Concrete Pad-April 24-May 1, 2017, 7:00am-5:00pm
Campus Wide - Switch from Heating Mode to Cooling Mode, May 1 to October 1, 2017
BUILDINGS REVISED: Facilities Condition Assessment with VFA, April 11 - 21, 2017, 7:00am-4:00pm
Laurier Hall-Flush Hot Water System, April 13-16, 2017, 4:00pm - 4:00pm
Essex Hall-Stage Area Renovations, April 24-30, 2017, 7:00am-5:00pm
Tunnel Isolation Valve Replacements, April 18, 2017, 6:00am-2:00pm
Essex Hall-Repairs on Pans AC12 and AC13, April 17-22, 2017, 6:00am-2:00pm
Domestic Hot Water Shutdown Until Further Notice
Chrysler Hall Tower-Emergency Hot Water Shutdown, April 12-13, 2017
Tunnel Insulation Repair, April 12-30, 2017, 6:00am-2:00pm
Facilities Condition Assessment with VFA, April 11 - 21, 2017, 7:00am-4:00pm
Laurier Hall-Asbestos Abatement and Valve Removal, April 11, 2017, 6:00am-2:00pm
Biology Building-Flaking Paint Removal, April 12-13, 2017, 8:00am-5:00pm
DATE/TIME REVISED: Science and Research Innovation Facility (SRIF) Project – Electrical Shutdown, April 15, 2017
DATE/TIME REVISED: Science and Research Innovation Facility (SRIF) Project – Data Shutdown, April 15, 2017
Chrysler Hall Tower-5th Floor Xerox Relocation, April 17-21, 2017, 8:00am-5:00pm
Education Building-Installation of New Railing, April 12-20, 2017, 7:00am-5:00pm
Lambton Tower-Chilled Coil Repair, April 11-13, 2017, 6:00am-2:00pm
Essex Hall-Motorized Damper Replacement, April 11-20, 2017, 6:00am-2:00pm
University Computer Centre-Breaching Repair Call Centre, April 11-13, 2017, 6:00am-2:00pm
Pitt Ferry Building-April 10-11, 2017, Flow Valve Repair, 6:00am-2:00pm
Pitt Ferry Building-Emergency Generator, April 7, 2017, 7:00am-10:00am
Biology Building-Roof Replacement, April 10-30, 2017, 7:00am-5:00pm
Vanier Hall/Cartier Hall- Vanier Circle Driveway - Field Verification, April 12, 2017, 8:00am-1:00pm
Former Clark Residence-Site Restoration, April 10-21, 2017
Essex Hall-Mould Abatement-Phase 2, Basement and 2nd Floor, April 17-28, 2017
CANCELLED UNTIL FURTHER NOTICE: Science and Research Innovation Facility (SRIF) Project – Steam Outage, April 5, 2017, 5:00am-6:00pm
Erie Hall-Washroom Upgrades Project - Air Balancing, April 3, 2017, 8:00am-2:00pm
St. Denis Fieldhouse-Drain Pan Repair, April 2-4, 2017, 6:00am-2:00pm
Science and Research Innovation Facility (SRIF) Project – Steam Outage, April 5, 2017, 5:00am-6:00pm
Essex Hall-Inspection and Maintenance on Fumehood Exhaust Fan, April 3, 2017, 7:30am-3:30pm
Essex Hall-HVAC Shutdown: South Wing-Basement, 1st and 2nd Floors, April 19-28, 2017
Assumption Hall/Dillon Hall-Roof Tops Repairs and Inspections, April 3, 2017, 8:00am-4:30pm
March 2017
Human Kinetics-Installation of New Flooring in Fieldhouse, April 11-May 20, 2017, 8:00am-5:00pm
Chrysler Hall North-File Cabinets Move to 2629 Riverside Dr., April 3-7, 2017, 8:00am-5:00pm
Human Kinetics- Removing Storage Cages, April 3-4, 2017, 8:00am-5:00pm
Erie Hall-Ceiling Space Clean Up, March 25, 2017, 8:00am-6:00pm
Centre for Engineering Innovation- MEMS Lab Fit-Out, March 27-September 8, 2017, 8:00am-7:00pm
Essex Hall - 335 Renovations/Fire Watch, March 24, 2017, 8:00am-12:00pm
Essex Hall-Mould Abatement/HVAC Shutdown, March 22, 2017, 4:30pm-10:30pm
Science and Research Innovation Facility (SRIF)-Curb Island Removal-March 22, 2017, 10:00am-4:00pm
Faculty of Education/Odette Building/Vanier Hall/Assumption Hall/Dillon Hall/Human Kinetics/St. Denis Field House/Energy Conversion Centre-Campus Roof Upgrades, March 20-April 24, 2017, 8:30am-4:30pm
Pitt Ferry Building-Building Envelope, March 27, 2017, 9:00am-1:00pm
Pitt Ferry Building-Plumbing Monthly Inspections, March 27, 2017, 9:00am-1:00pm
Pitt Ferry Building-Sprinkler System Inspections, March 29, 2017, 9:30am-11:30am
Pitt Ferry Building-Fire Protection, March 31, 2017, 8:00am-10:00am
Essex Hall-Mould Abatement/HVAC Shutdown, March 9, 2017, 4:30pm-10:30pm
Pitt Ferry Building-Installation of Tile Floor at New Door Locations, March 8, 2017, 8:00am-5:00pm
Essex Hall-335 Renovations/Fire Watch, March 9, 2017, 8:00am-10:00am
Chrysler Hall Tower-Wall Repairs, March 2, 2017, 7:45am-4:30pm
Essex Hall- Water Leak Repair in Washroom, March 3, 2017, 12:00pm-4:00pm
Centre for Engineering and Innovation-Emergency Steam Outage, March 1, 2017, 6:00am-10:00am
Essex Hall-Mould Abatement/HVAC Shutdown, March 7, 2017, 4:00pm-11:00pm
February 2017
Lambton Tower-Maintenance in Penthouse Mechanical Room, February 28-March 8, 2017, 6:00am-4:00pm
Essex Hall-Mould Abatement, March 6-May 30, 2017, 8:00am-5:00pm
CAW Student Centre-Fire Alarm System Updates, February 28, 2017, 8:00am-4:00pm
University Computer Centre-Testing of the Fire Suppression System, March 1, 2017, 8:00am-4:00pm
Essex Hall-Room 335 Renovations/Asbestos Abatement, February 22, 2017, 8:30am-4:30pm
Grounds Building-Replacement of Door Frame and Door at Garage, February 22, 2017, 7:30am-4:30pm
Chrysler Hall North/Lambton Tower-Elevator in Service Mode, February 21-22, 2017, 9:00am-4:00pm
Chrysler Hall North-Elevator in Service Mode, February 21-22, 2017, 9:00am-4:00pm
CAW Student Centre-Domestic Hot Water Shutdown, February 21-22, 2017, 5:30pm-4:30pm
Erie Hall/Lambton Tower-Washroom Exhaust Fan and HVAC, February 15-March 10, 2017, 7:30am-4:30pm
Chrysler Hall Tower-Installation of Guard Rail on Roof Top, February 14, 2017, 8:00am-4:00pm
Essex Hall-Room 335 Renovations, February 15-March 31, 2017, 7:00am-5:00pm
Essex Hall-Room 335 Renovations/Asbestos Abatement, February 15, 2017, 4:30pm-10:30pm
Emergency Phone Pole Installation-February 13-28, 2017, 7:00am-5:00pm
Pitt Ferry Building-Plumbing Monthly Inspections, February 22, 2017, 12:00pm-4:00pm
Pitt Ferry Building-Building Envelope, February 22, 2017, 12:00pm-4:00pm
Pitt Ferry Building-Fire Protection, February 24, 2017, 8:00am-10:00am
Pitt Ferry Building-Sprinkler System Inspections, February 28, 2017, 8:00am-10:00am
Essex Hall-Air Handling Upgrades, February 8, 2017, 4:00pm-9:00pm
Chrysler Hall North-Electrical Work(Power,Data,Phone), February 8-10, 2017, 8:00am-4:30pm
Chrysler Hall Tower-Laminate Flooring Repair/Air Handling Units to Full Exhaust, February 17-20, 2017, 3:00pm-7:00am
Tunnel-Removal of Weak Concrete Spots, February 3-10, 2017, 8:00am-4:00pm
Chrysler Hall Tower-Installation of New Carpeting, February 1, 2017, 4:30pm-11:00pm
Chrysler Hall North-Bearing Replacement, February 4, 2017, 6:00am-6:00pm
Biology Building-Coil Installation, February 3-4, 2017, 12:00pm-4:00pm
Assumption Hall-Asbestos Reassessment, February 1, 2017, 1:00pm-2:30pm
January 2017
Essex Hall/Erie Hall-Banner Removal and Installation, January 30, 2017, 8:00am-5:00pm
Pitt Ferry Building-Warranty Repairs, January 27, 2017, 8:00am-4:00pm
Dillon Hall-Guarding Installation on HVAC Units, January 26-31, 2017, 8:00am-4:00pm
CAW Student Centre-Fire Alarm System Out of Service, January 25, 2017, 9:30am-11:00am
CAW Student Centre-Shutdown of Electrical Panel LP-N, January 20, 2017, 7:00am-4:00pm
Pitt Ferry Building-Installation of New Hasp Lock on Courtyard Gate, January 16, 2017, 8:00am-5:00pm
Health Education Centre-Interior Sign Upgrades, January 16-20, 2017, 8:30am-4:30pm
Pitt Ferry Building-Plumbing Inspections, January 19, 2017, 12:00pm-4:00pm
Pitt Ferry Building-Building Envelope, January 19, 2017, 12:00pm-4:00pm
Pitt Ferry Building-Sprinkler System Inspections, January 25, 2017, 8:00am-10:30am
Pitt Ferry Building-Emergency Generator Inspection, January 27, 2017, 8:00am-12:00pm
Pitt Ferry Building-Fire Protection Inspections, January 27, 2017, 10:30am-12:00pm
Essex Hall-Main Entrance Lobby Painting, January 23-January 28, 2017, 8:00am-5:00pm
Laurier Hall/Vanier Hall-Emergency Repair on Perimeter Heating Line, January 17, 2017, 4:00am-2:00pm
Assumption Hall-Contractors Site Visit and Tour, January 13, 2017, 10:00am-11:00am
Essex Hall-Emergency Excavation To Repair Sewer Line, January 11, 2017, 8:00am-4:00pm
Freed Orman Centre-Washrooms Hot Water Shutdown, January 12, 2017-February 1, 2017, 8:00am-5:00pm
Biology Building-Emergency Repair on Mixing Boxes, January 10, 2017, 6:00am-2:00pm
Essex Hall-Signage Removal, January 11, 2017, 9:00am-4:00pm
Biology Building-Fire Alarm System Testing, January 9, 2017, 7:00am-5:00pm
Human Kinetics-Insulating and Sealing Outside Walls, January 9-13, 2017, 7:00am-5:00pm
Assumption Hall-Contractors Site Visit and Tour, January 6, 2017, 10:00am-11:00am
CAW Student Centre-Fire Alarm System Shutdown, January 4, 2017, 8:00am-1:00pm
Law Building/Health Education Centre-Sign Upgrades, January 3-13, 2017, 8:30am-4:30pm
December 2016
Odette School of Business-Cleaning and Painting, December 23, 2016 - January 2, 2017, 8:00am-4:00pm
Health Education Centre/Essex Hall-Painting, December 23, 2016-January 2, 2017, 8:00am-4:00pm
CAW Student Centre-Fire Alarm Shutdown, December 28-29, 2016, 8:00am-4:00pm
Lambton Tower-Ceiling Tile Replacement, December 21, 2016, 5:00pm-10:00pm
Centre for Engineering Innovation-Fire Alarm Testing, December 23, 2016, 7:00am-4:00pm
University Computer Centre-Exterior Surfaces Ducts Cleaning, December 17, 2016, 6:00am-4:00pm
Biology Building-Fume Hood Exhaust Fan Shutdown, December 19, 2016, 7:00am-5:00pm
Assumption/CAW Student Centre Tunnel-Mold Remediation, January 9-February 1, 2017, 8:00am-5:00pm
Pitt Ferry Building-Exit Sign Installations, December 13, 2016, 8:00am-5:00pm
Pitt Ferry Building-Building Envelope Inspection, December 22, 2016, 12:00pm-4:00pm
Pitt Ferry Building-Plumbing and Roof Inspections, December 22, 2016, 12:00pm-4:00pm
Pitt Ferry Building-Sprinkler System Inspection, December 23, 2016, 8:00am-10:30am
Alumni Hall-Power Outage for High Voltage Testing, December 22, 2016, 9:00am-1:00pm
Chrysler Hall North-Painting Offices/Sanding Wood Doors, December 12-30, 2016, 8:00am-12:00pm
Biology Building-Fume Hood Exhaust Fan Shutdown, December 14, 2016, 7:00am-5:00pm
Pitt Ferry Building-Emergency Door Toppers Repair, December 11, 2016, 6:00am-2:00pm
CAW Student Centre-Emergency Steam Line Repair, December 10, 2016, 4:00am-8:00am
Biology Building-Emergency Mixing Box Repair, December 10, 2016, 6:00am-2:00pm
Pitt Ferry Building-Installation of Roller Latches on Doors, December 19-20, 2016, 8:00am-5:00pm
Pitt Ferry Building-Painting, December 9, 2016, 8:00am-5:00pm
CAW Student Centre-Emergency Steam Line Repair, December 10, 2016, 6:00am-2:00pm
Essex Hall-Electrical Work/Ceiling Repair/Painting, December 13, 2016-January 9, 2017, 8:00am-4:00pm
Pitt Ferry Building-Metal Gates Installation, December 8, 2016, 8:00am-5:00pm
CAW Student Centre-Fire Alarm Shutdown, December 12, 2016, 8:00am-4:00pm
Union House-Roof Repair and Upstairs Room Repair, December 8-9, 2016, 8:00am-4:00pm
Lambton Tower-Emergency Steam Repair, December 3, 2016, 6:00am-2:00pm
Essex Hall-Emergency Steam Repair, December 3, 2016, 6:00am-2:00pm
November 2016
CAW Student Centre-Saw-cutting of First Floor, December 5-6, 2016, 7:30am-2:00pm
Energy Conversion Centre-Boom Truck Set Up on West Side of ECC, November 29, 2016, 8:00am-4:00pm
Essex Hall-New Epoxy Flooring, November 23-27, 2016, 8:30am-4:30pm
Essex Hall-Emergency Steam Repair, November 22, 2016, 7:00am-2:00pm
Human Kinetics-Winterizing Coils, November 21, 2016, 7:00am-2:00pm
Essex Hall-Domestic Hot and Cold Water Shutdown, November 22, 2016, 7:30am-12:00pm
Essex Hall-Emergency Steam Repair, November 21, 2016, 7:00am-2:00pm
Law Building-Wireless Coverage Testing, November 15, 2016, 12:00pm-3:00pm
Pitt Ferry Building-Exterior Lights Inspection, November 22, 2016, 5:30pm-8:00pm
Student Quad-Relocation of Trees, November 18-20, 2016, 7:00am-4:00pm
Forge Fitness-Wireless Coverage Testing, November 15, 2016, 8:30am-2:00pm
Essex Hall-Inspection and Maintenance on Fumehood Exhaust Fan, November 22, 2016, 7:00am-12:00pm
Essex Hall-Reconstruct Vent Piping on Vacuum Pump in Basement, November 15, 2016, 7:00am-1:00pm
Pitt Ferry Building-Emergency Generator, November 25, 2016, 8:00am-12:00pm
Pitt Ferry Building-Fire Protection Inspections and Testing, November 25, 2016, 10:30am-12:00pm
Pitt Ferry Building-Inspection of the Sprinkler System, November 28, 2016, 1:00pm-3:00pm
Pitt Ferry Building-Building Envelope Inspections, November 29, 2016, 12:00pm-4:00pm
Pitt Ferry Building-Plumbing Inspection, November 29, 2016, 12:00pm-4:00pm
Essex Hall-Electrical/Plumbing, November 15-18, 2016, 8:00am-4:30pm
Chrysler Hall Tower-Renovations to Accounts Payable Kiosk, November 14-18, 2016, 7:00am-4:00pm
Essex Hall-Natural Gas Outage, November 11-15, 2016, 8:00am-4:00pm
Chrysler Hall Tower West Elevator is Out of Service - November 8, 2016, 8:00am-11:00pm
Pitt Ferry Building-Exterior Lights Inspection, November 23, 2016, 5:30pm-8:00pm
Dillon Hall-Elevator Shut Down, November 2-7, 2016, 12:00pm-4:00pm
Chrysler Hall Tower - HVAC, November 1, 2016, 7:30 am - 4:30 pm
Biology Building-Steam/Domestic Hot Water/Heating-November 1, 2016, 7:00 am - 1:00 pm
Pitt Ferry Building-Installation of Roller Latches on Door Frames, November 2, 2016, 8:00am-5:00pm
Joyce Entrepreneurship Centre-Installation of Partition Wall, November 2, 2016, 8:30am-4:30pm
October 2016
Clark Residence I & II-Demolition, October 31, 2016 - November 30, 2016, 8:00 am - 5:00 pm
Laurier Hall-Replace Caulking on South Side of Building, October 21, 2016, 8:00am-5:00pm
Pitt Ferry Building-Plumbing Inspections, October 27, 2016, 8:00am-12:00pm
Pitt Ferry Building-Building Envelope Inspection, October 27, 2016, 8:00am-12:00pm
Pitt Ferry Building-Room Divider Maintenance, November 2, 2016, 2:30pm-5:30pm
Alumni Hall-Building Envelope Testing, October 20, 2016, 5:00am-12:00pm
Chrysler Hall Tower-Painting Door Frames, October 18, 2016, 7:30am-12:00pm
Pitt Ferry Building-Emergency Generator Monthly Inspection, October 21, 2016, 8:00am-12:00pm
Pitt Ferry Building-Sprinkler System Monthly Inspection, October 21, 2016, 8:00am-10:00am
Pitt Ferry Building-Fire Protection Monthly Inspection, October 28, 2016, 10:30am-12:00pm
Essex Hall-Grass Area of Courtyard Closure, October 19-21, 2016, 8:00am-5:00pm
Pitt Ferry Building-Divider Maintenance, October 21, 2016, 9:00am-11:00am
Clark Residence-Phase 1-Watermain Work, October 14, 2016, 7:00am-4:30pm
Biology Building-Relocation of the FDC Connection, October 17-21, 2016, 7:00am-5:00pm
Pitt Ferry Building, Panel Ceiling Installations, October 12-13, 2016, 8:00am-5:00pm
Flushing and CCTV Inspection of Sewer Lines-October 17-19, 2016, 8:00am-4:00pm
DATE REVISED: Law Building-Sound Proof Counsellor Room, October 7-14, 2016, 8:00am-5:00pm
Law Building-Sound Proof Counsellor Room, October 11-14, 2016, 8:00am-4:00pm
Chrysler Hall Tower (CHT)-HVAC, 2nd Floor Washrooms, October 5 - 6, 2016, 8:00 am - 3:00 pm
Medical Education Building (MEB)-Inspection of Fire Dampers, October 5, 2016, 7:00 am - 1:00 pm
Chrysler Hall Tower (CHT)-HVAC 6th Floor, Rm 616 and Corridor, October 4, 2016, 7:30 am - 1:00 pm
Chrysler Hall North-G120 Noise Due to Drilling or Hammer Use, October 3-7, 2016, 8:00am-4:00pm
846 Sunset Garage-Electrical Connection Updates, October 6-7, 2016, 7:00am-5:00pm
Pitt Ferry Building-Scheduled Fire Drill, October 5, 2016, 3:30pm-4:00pm
September 2016
Assumption Hall-Site Conditions Inspection, September 29, 2016, 1:00pm-4:00pm
Pitt Ferry Building - Sprinkler System, September 30, 2016, 8:00 am - 12:00 pm
Pitt Ferry Building - Fire Protection, September 30, 2016, 10:30 am - 12:00 pm
Pitt Ferry Building-Drywall Repair, September 28, 2016, 8:00am-4:00pm
Medical Education Building - Steam - September 27-28, 2016, 7:00 am - 4:00 pm
University Computer Centre - Ventilation, September 26 - October 2, 2016, 7:00 am - 4:00 pm
Pitt Ferry Building - Building Envelope, September 29, 2016, 8:00 am - 12:00 pm
Pitt Ferry Building - Plumbing, September 29, 2016, 8:00 am - 12:00 pm
Campus Wide - Heating and Cooling, October 3 - 17, 2016, 12:00 pm - 10:00 am
Essex Hall-External Cleaning of Duct Work, September 26-27, 2016, 7:30 am - 4:00 pm
GLIER-Access to Hallway at First Floor, September 28 - 30, 2016, 7:00 am - 12:00 pm
Assumption Hall/Essex Hall-Heating and Ventilation, September 14 - 30, 2016, 7:00 am - 4:00 pm
Medical Education Building-Temporary Parking Closure in Lot W, September 21-27, 2016, 7:00am-5:00pm
Joyce Entrepreneurship Centre-Fire Alarm/Sprinkler System Updates, September 22, 2016, 7:30am-4:30pm
Chrysler Hall Tower, 6th Floor, Rm 600-Type 2 Asbestos-September 20, 2016, 8:30 am - 12:00 pm
Clark Residence I - Parking Lot Closed at Sunset Entrance, September 22, 2016 - November 25, 2016
LeBel Building, No Access to Rooms 101, 101-A, 101-B, September 15 - 16, 2016, 8:00 am - 5:00 pm
Leddy Library (East) Main Building-Type II Asbestos Abatement, September 15-16, 2016, 10:00pm-8:00am
Essex Hall-Mold Removal Treatment on Ductwork, September 14-16, 2016, 4:30pm-10:30pm
Assumption Hall/Essex Hall-Intermittent Fan Interruptions, September 14-19, 2016, 7:00am-4:00pm
Biology Building-HVAC Shutdown, September 13-15, 2016, 7:30am-4:00pm
Assumption Hall/University Computer Centre-Parking Lot Access, September 2-4, 2016, 8:00am-4:00pm
Laurier Hall-Intermittent Fan Interruptions, September 2, 2016, 7:00am-4:00pm
Pitt Ferry Building-Power Outage, September 11, 2016, 7:30am-4:00pm
Joyce Entrepreneurship Centre-HVAC Shutdown, September 2, 2016, 7:30am-4:00pm
Pitt Ferry Building-Sprinkler System Inspection, September 8, 2016, 8:00am-12:00pm
Chrysler Hall Tower-Construction Work on 2nd Floor, September 6-10, 2016, 8:00am-4:00pm
Pitt Ferry Building-Building Envelope, September 1, 2016, 8:00am-4:00pm
August 2016
Biology Building-Ceiling Tile Repair Work, August 31, 2016, 7:30am-4:00pm
Welcome Centre-Fire Alarm System Testing and Verification, August 26, 2016, 7:00am-8:00am
Medical Education Building-HVAC Units Upgrade, August 24, 2016, 7:30am-1:30pm
Centre for Engineering Innovation-Lighting Upgrades, August 22-25, 2016, 7:30am-4:00pm
Human Kinetics-Air Conditioning-August 22-23, 2016, 7:00am-12:00pm
Centre for Engineering Innovation-Lighting Upgrades, August 22-25, 2016, 7:30am-4:00pm
Essex Hall-Wiring Installations, August 22-September 17, 2016, 7:00am-4:00pm
Pitt Ferry Building-Building Envelope Inspection, August 25, 2016, 8:00am-12:00pm
Pitt Ferry Building-Fire Protection Inspections, August 26, 2016, 10:30am-12:00pm
Pitt Ferry Building-Emergency Generator Inspections, August 26, 2016, 8:00am-12:00pm
Pitt Ferry Building-Sprinkler System Inspection, August 31, 2016, 8:00am-12:00pm
Joyce Entrepreneurship Centre-Sprinkler System Upgrades, August 23, 2016, 7:30am-4:30pm
Medical Education Building-Repair Fire Dampers, August 18, 2016, 7:00am-1:00pm
Assumption Hall-Elevator Repairs, August 17-23, 2016, 8:00am-4:00pm
Law Building-Plumbing and Floor Repairs to Washrooms, August 19-26, 2016, 8:00am-5:00pm
Erie Hall - Fire Alarm System, August 18, 2016, 7:30 am - 4:00 pm
Annual Fire Alarm Operations and Verification, August 22-29, 2016, 7:00am-4:00pm
Annual Fire Alarm Operations and Verification, August 15-19, 2016, 7:00am-4:00pm
Vanier Hall-Repairs at Entrance Vestibule, August 12-17, 2016, 7:00am-4:00pm
Essex Hall-Washing Plumbing Repair, August 12-14, 2016, 4:00pm-5:00pm
Chrysler Hall North-Washroom Plumbing Repair, August 12-14, 2016, 4:00pm-5:00pm
Maintenance Building-Floor Repair, August 11-18, 2016, 8:00am-4:00pm
Cartier Hall- Air Conditioning Maintenance, August 22-26, 2016, 7:00am-12:00pm
Memorial Hall-Air Conditioning Maintenance, August 11-19, 2016, 7:00am-12:00pm
Power Generator Testing and Inspection, August 16-19, 2016, 8:00am-4:00pm
Sunset Avenue-Replacement of Concrete Panel, August 12, 2016, 7:00am-5:00pm
Campus Wide Steam Outage for 15 Minutes-Steam and Hot Water, August 4, 2016, 1:00 pm - 2:00 pm
Annual Fire Alarm Operations and Verifications, August 8-12, 2016, 7:00am-4:00pm
Annual Fire Alarm Operations and Verifications, August 2-5, 2016, 7:00am-4:00pm
July 2016
Inspection for Facilities Survey Designated Substances, July 27 - November 8, 2016, 8:00am - 12:00am
Pitt Ferry Building-Building Envelope Inspection, July 28, 2016, 12:00pm-4:00pm
Biology Building-Repair Capped HVAC and Fumehood Exhaust Ductwork, July 20-21, 2016, 2:30pm-7:00am
Pitt Ferry Building-Dry Wall Repairs, July 20-26, 2016, 8:00am-12:00pm
Pitt Ferry Building-Air Conditioning/Ventilation, July 22-23, 2016, 7:00am - 4:00pm
Pitt Ferry Building-Sprinkler System Inspection, July 26, 2016, 8:00am - 12:00pm
Pitt Ferry Building-Emergency Generator Inspection and Testing, July 29, 2016, 8:00am - 12:00pm
Pitt Ferry Building-Building Envelope, July 29, 2016, 12:00pm - 4:00pm
Pitt Ferry Building-Fire Protection Inspection, July 29, 2016, 8:30am - 12:00pm
Pitt Ferry Building-Plumbing Inspections, July 29, 2016, 12:00pm - 4:00pm
Leddy Library East Main Building-Paint Room 105, July 18, 2016, 8:00am-4:30pm
Biology Building-Repair Capped HVAC and Fumehood Exhaust Ductwork, July 20, 2016, 4:30pm-10:00pm
Chrysler Hall South-Room 181 Repair Work, July 14-29, 2016, 8:00am-4:30pm
DATE EXTENDED: Memorial Hall-Fire Alarm System Inspection, July 14, 2016, 9:00am-2:00pm
Campus Wide Steam Outage, July 9, 2016, 6:00 am - 2:00 pm
Biology Building-Heating and Cooling Yearly Maintenance, July 4-11, 2016, 7:00am-4:00pm
Pitt Ferry Building-Emergency Generator Testing, July 14, 2016, 8:00am-12:00pm
Memorial Hall-Fire Alarm System Inspection, July 13, 2016, 9:00am-2:00pm
Assumption Hall-New Flooring Installation, July 6-15, 2016, 8:30am-4:30pm
June 2016
Pitt Ferry Building-Plumbing Inspection, June 29, 2016, 12:00pm-4:00pm
Alumni Hall-Fibre Optic Cable Repairs, June 27, 2016, 8:00am-4:30pm
Biology Building-Ceiling Area Repair Work, June 25-27, 2016, 8:00am-4:00pm
CAW Student Centre/Vanier Hall-Bike Pad Installations, June 27-July 8, 2016, 7:00am-5:00pm
Chrysler Hall South-Removal of ACM Flooring, June 23-24, 2016, 4:00pm-7:00am
Law Building-Penthouse HVAC Supply and Return Fans, June 24, 2016, 7:30am-12:00pm
Pitt Ferry Building-Building Envelope, June 27, 2016, 12:00pm-4:00pm
Pitt Ferry Building-Emergency Generator and Lighting Inspections, June 27, 2016, 8:00am-12:00pm
Pitt Ferry Building-Plumbing Inspections, June 27, 2016, 12:00pm-4:00pm
Pitt Ferry Building-Fire Protection Inspections, June 28, 2016, 8:00am-4:00pm
Pitt Ferry Building-Sprinkler System Inspection, June 29, 2016, 8:00am-4:00pm
Pitt Ferry Building-Elevator Inspections, June 30, 2016, 9:00am-12:00pm
Emergency Power Generator Annual Testing and Inspection, June 16-August 15, 2016, 8:00am-4:00pm
Energy Conversion Centre-Asbestos Abatement, June 25, 2016, 7:30am - 4:30pm
Chrysler Hall Tower-Emergency Fan Repair, June 14-17, 2016, 12:00pm-4:30pm
Laurier Hall - HVAC Maintenance, June 20-July 8, 2016, 6:00am-4:00pm
Biology Building - Fire Alarm Shut Down, June 14, 2016, 7:30am-5:00pm
Lambton Tower-Asbestos Insulation Removal with Glove Bag, June 14, 2016, 7:15am-9:15am
St. Denis Fieldhouse-New Drip Plan Installation for Air Handler #2, June 9-10, 2016, 7:00am-4:00pm
Jackman Dramatic Art Centre- Replace Steam and Condensate Piping, June 9, 2016, 7:00am-4:00pm
Annual Fire Alarm Operations and Verifications, June 13-17, 2016, 7:00am - 4:00pm
Assumption Hall-Front Access to Assumption Hall Closed, June 6-13, 2016, 7:30am-7:00pm
Alumni Hall-Heating/Cooling Maintenance and Inspection, June 6-13, 2016, 8:00am-4:00pm
Parking Lot W Closed for Construction Permanently-June 10, 2016, 12:00pm
Biology-Rough-In of Piping for Fumehoods Installation, June 1-14, 2016, 9:00am-5:00pm
Pitt Ferry Building-Elevator Inspections, June 1, 2016, 1:30pm-2:30pm
Pitt Ferry Building-Building Envelope, June 1, 2016, 8:00am-4:00pm
Pitt Ferry Building-Plumbing, June 1, 2016, 8:00am-4:00pm
CAW Student Centre-New Food Service Installation, June 1-August 30, 2016, 8:00am-5:00pm
Alumni Hall/Clark Residence I and II, Fibre Optic Cable Update, June 26, 2016, 7:00am-6:00pm
Campus Wide Steam Outage, June 24, 2016 - June 27, 2016, 12:00pm - 10:00am
Campus Wide Power Outage, June 26, 2016, 6:00am - 6:00pm
May 2016
Lambton Tower-Emergency Bearing Replacement, May 30, 2016, 9:30am-3:00pm
Education Building-Elevator Out of Service, April 29-June 30, 2016, 8:00am-4:00pm
Chrysler Hall Tower-Air Distribution System Investigation, May 30, 2016, 8:30am-4:00pm
Energy Conversion Centre-Asbestos Abatement, May 31-June 3, 2016, 7:30am-4:30pm
Pitt Ferry Building-Building Switchgear Inspection, May 29, 2016, 8:00am-4:00pm
Medical Education Building-Fire Alarm System Updates, May 26-27, 2016, 7:30am-12:00pm
Law Building-Emergency Leak Repair, May 25, 2016, 8:30am-11:00am
Centre for Engineering Innovation-Installation of Data Cable, May 27, 2016, 8:30 am - 4:30 pm
Law Building-Fans Insulation Completion, May 24, 2016, 7:00 am - 11:00 am
Biology Building-HVAC and Fumehood Exhaust Shutdown, May 24, 2016, 7:00am-7:00pm
Chrysler Hall Tower-Emergency Bearing Replacement, May 19, 2016, 9:30am-3:00pm
Innovation Centre/Parking Garage-Fire Alarm Updates-May 25, 2016, 7:30 am - 4:30 pm
Lambton Tower-Emergency Fan Shutdown, May 13-23, 2016, 10:00am-2:00pm
Erie Hall/Lambton Tower-Men's & Women's Washrooms Shutdown, May 17-September 16, 2016, 7:30am-4:30pm
Medical Building Lot "W"-No Pay & Display Parking Available, May 20, 2016, 7:00am-2:00pm
Pitt Ferry Building-Fire Protection, May 27, 2016, 10:30am-2:30pm
Pitt Ferry Building-Emergency Generator/Emergency Lighting, May 27, 2016, 8:00am-12:00pm
Pitt Ferry Building-Plumbing, May 30, 2016, 8:00am-2:30pm
Pitt Ferry Building-Building Envelope, May 30, 2016, 8:00am-2:30pm
Pitt Ferry Building-Elevator, May 30, 2016, 1:30pm-3:00pm
Pitt Ferry Building-Sprinkler System, June 3, 2016, 8:00am-12:00pm
Chrysler Hall Tower-West Elevator Out of Service, May 18-20, 2016, 9:00am-4:00pm
Law Building-Fans, May 13, 2016, 10:00am-2:00pm
Biology Building-Electrical Power, May 14, 2016, 8:00am-4:00pm
Energy Conversion Centre-Window Replacement, May 13, 2016, 8:00am-4:00pm
Erie Hall-Fire Alarm System Updates, May 12, 2016, 8:30am-4:00pm
Assumption Hall-Domestic Hot Water Shutdown, May 13, 2016, 9:30am-2:00pm
Assumption Hall-Fire Suppression System Inspection, May 17, 2016, 1:00pm-4:00pm
Erie Hall/Lambton Tower, Fire Alarm System, May 9-20, 2016, 7:30am-3:30pm
Law Building-Fans Shutdown, May 6, 2016, 11:00am-4:00pm
St. Denis Fieldhouse & Human Kinetics-Intermittent Fan Operation, May 9-13, 2016, 7:00am-3:00pm
Energy Conversion Centre-Chimney Repair, May 9-13, 2016, 7:00am-3:00pm
Pitt Ferry Building-Exterior Window Washing, May 9, 2016, 7:00am-4:00pm
Assumption Hall-Assumption University Park Lot/Dead Tree Removal, May 10-11, 2016, 7:00am-5:00pm
Erie Hall/Lambton Tower-Type II and Type III Asbestos Abatement, May 9-18, 2016, 7:30am-11:00pm
Pitt Ferry Building-Heating/Ventilation, May 6, 2016, 7:00am-4:00pm
Chrysler Hall Tower/Chrysler Hall South-CHT South Entrance Door/CHS North Entrance Door/Southeast Stairs to Deck, May 6, 2016, 8:30am-4:30pm
Welcome Centre-Fire Alarm/Sprinklers/HVAC Units, May 6-7, 2016, 7:00am-4:00pm
Essex Hall-Construction of New Gate Along Patricia Avenue, May 7-August 31, 2016, 7:00am-5:00pm
REVISED DATE: Law Building-Fans, May 2-4, 2016, 7:00am-3:00pm
REVISED: Pitt Ferry Building-Building Envelope, May 4, 2016, 8:00am-4:00pm
REVISED: Pitt Ferry Building-Plumbing, May 4, 2016, 8:00am-4:00pm
Centre for Automotive Research & Education-Fire Alarm Inspection, May 4-5, 2016, 8:30am-4:30pm
CAW Student Centre/Vanier Hall- Fire Suppression System Inspections, May 4, 2016, 8:00am-4:00pm
Odette School of Business/Law Building-Fibre Optic Cable Upgrades, May 9-29, 2016, 8:30am-4:30pm
Campus Wide Switchover - Heating to Cooling Mode, May 1, 2016 - October 17, 2016, 12:00pm - 10:00am
Pitt Ferry Building, Sprinkler System/Fire Protection Back Flow, May 6, 2016, 12:00pm - 4:00pm
April 2016
University Computer Centre-Steam Meter Installation, April 28-May 2, 2016, 7:00am-4:00pm
Essex Hall - Chemical Control Centre-Cold Water/Vacuum, April 28, 2016, 7:30am-8:30am
Law Building-Fans, April 26-29, 2016, 7:00am-3:00pm
Centre for Engineering Innovation-Smoke Exhaust System, April 28, 2016, 5:00pm-7:00pm
Residence Hall West (formerly MacDonald Hall) - Land Survey, April 27-29, 2016, 7:00am-5:00pm
Parking Garage-Column Repairs, April 25-29, 2016, 7:00am-4:00pm
DATE REVISED: Memorial Hall-Fire Alarm Updates, April 25, 2016, 7:30am-12:00pm
Memorial Hall-Fire Alarm Updates, April 22, 2016, 7:30am-12:00pm
DATE REVISED: Chrysler Hall Tower-Air Handling Units Exhaust, April 24-26, 2016, 8:00am-3:00pm
Assumption Hall-Fire Alarm System Updates, April 21, 2016, 7:00am-12:00pm
Education Building-Elevator Out of Service, April 29-May 27, 2016, 8:00am-4:00pm
Joyce Entrepreneurship Centre/Parking Garage-Fire Alarm Upgrades, April 27, 2016, 7:30am-4:30pm
Dillon Hall-Main Entrance Sidewalk Access, April 25-30, 2016, 7:30am-4:30pm
Chrysler Hall Tower-Air Handling Units Exhaust, April 20-22, 2016, 8:00am-3:00pm
Odette School of Business-Access to Loading Dock, April 19-26, 2016, 7:00am-5:00pm
Chrysler Hall North/Chrysler Hall South - Window Replacement, April 19-21, 2016, 8:00am-4:00pm
Assumption Hall - Fire Alarm System Updates, April 19, 2016, 8:00am-11:00am
Chrysler Hall Tower - West Elevator Out of Service, April 13-14, 2016, 9:00am - 4:00pm
Pitt Ferry Building-Backflow Prevention Testing, April 22, 2016, 11:00am-4:00pm
Pitt Ferry Building, Plumbing - April 28, 2016, 8:00am - 4:00pm
Pitt Ferry Building, Building Envelope, April 28, 2016, 8:00am - 4:00pm
Pitt Ferry Building, Emergency Generator/Emergency Lighting, April 29, 2016, 8:00am - 12:00pm
Pitt Ferry Building, Fire Protection, April 29, 2016, 10:30am - 2:30pm
Chrysler Hall Tower-Air Handling Units Shutdown, April 14-15, 2016, 3:00pm-7:00am
Tunnel/Central Refrigeration Plant-Chilled Water Piping Repair, April 11-16, 2016, 7:00am - 3:00pm
Assumption Hall - Domestic Cold & Hot Water Shutdown, April 11, 2016, 7:00am-10:00am
Pitt Ferry Building - Plumbing, April 5, 2016, 8:00am - 4:00pm
Pitt Ferry Building - Sprinkler System, April 7, 2016, 8:00am-4:00pm
Pitt Ferry Building - Emergency Generator/Emergency Lighting, April 1, 2016, 8:00am-12:00pm
Pitt Ferry Building - Fire Protection, April 1, 2016, 11:30am-4:00pm
March 2016
Essex Hall - Domestic Hot and Cold Water Shutdown, March 29, 2016, 12:00pm - 4:00pm
Vanier Hall - Domestic Hot Water Shutdown, March 24, 2016, 2:00pm-4:00pm
Essex Hall - Fume Hood Repair, March 29-31, 2016, 1:00pm -3:00pm
Centre for English Language Development - IT Closet/Mechanical Room, March 28, 2016, 8:00am-4:30pm
Pitt Ferry Building - Building Envelope, March 29, 2016, 8:00am-4:00pm
Pitt Ferry Building - Plumbing, March 29, 2016, 8:00am-4:00pm
Pitt Ferry Building - Elevator Inspections/Testing, March 24, 2016, 8:30am-12:00pm
Service Tunnels - Insulation Repairs/Asbestos Removal, March 21-24, 2016, 7:00am - 3:00pm
Central Refrigeration Plant-Cooling Water Pump, March 23, 2016, 9:00am-3:00pm
Leddy Library (East) Main Building-Fire System Testing/HVAC System-March 23, 2016, 8:00am-5:00pm
Essex Hall/Chemical Control Centre, Fire Alarm System/HVAC-March 22, 2016, 8:00am-4:00pm
University Computer Centre-HVAC Units, March 22, 2016, 8:00am-4:00pm
SAFETY ADVISORY-The Safe Disposal of Appliances Containing Ozone Depleting Refrigerants
Pitt Ferry Building-Heating/Ventilation, March 23, 2016, 7:00am-4:00pm
Human Kinetics-Heating, March 21-23, 2016, 7:00am-4:00pm
Odette School of Business - Fire Alarm System Inspection & Survey, March 16-17, 2016, 8:00am-4:00pm
Erie Hall/Lambton Tower - Fire Alarm Updates, March 14, 2016, 7:30am-2:00pm
Chrysler Hall South - Emergency Domestic Cold Water Shutdown, March 9, 2016, 8:00am-9:30am
Chrysler Hall Tower-Building HVAC System/Type II Asbestos Work, March 11-13, 2016, 5:30pm - 4:00pm
Chrysler Hall Tower - Renovations East End 3rd Floor, March 8, 2016-May 13, 2016, 8:00am-4:00pm
Pitt Ferry Building - Electrical, March 17, 2016, 8:00am-12:00pm
Lambton Tower/Medical Education Building- Heating Ventilation, March 28-April 4, 2016, 7:00am-4:00pm
Jackman Dramatic Art Centre/Innovation Centre- Heating Ventilation, March 21-28, 2016, 7:00am-4:00pm
Biology/Dillon Hall - Heating Ventilation, March 7-11, 2016, 7:00am-4:00pm
Pitt Ferry Building - Fire Extinguishers Inspection, March 7, 2016, 8:00am-4:00pm
Pitt Ferry Building - Emergency Generator, March 8, 2016, 8:00am-4:00pm
Pitt Ferry Building - Sprinkler System Inspection, March 9, 2016, 8:00am-4:00pm
Pitt Ferry Building - Fire Protection, March 1, 2016, 8:00am - 4:00pm
Pitt Ferry Building - Building Envelope, March 2, 2016, 8:00am - 4:00pm
Pitt Ferry Building - Plumbing, March 2, 2016, 8:00am - 4:00pm
February 2016
Pitt Ferry Building - Emergency Phone Installation, February 24 - 25, 2016, 8:00am - 4:00pm
Pitt Ferry Building - Elevator Out of Service - February 26, 2016, 1:00pm - 4:00pm
Essex Hall EH - Domestic Cold Water Shut Down, February 18, 2016, 3:00 pm - 8:00 pm
Welcome Centre - Fire Alarm System, February 29, 2016, 8:30am-10:30pm
Pitt Ferry Building - Fire Protection Inspections, February 26, 2016, 1:00pm - 4:00pm
Pitt Ferry Building - Emergency Generator/Emergency Lighting, February 26, 2016, 8:00am - 12:00pm
Assumption Hall - Storm Piping System Upgrade, February 16, 2016 - May 30, 2016, 7:00am-5:00pm
REVISED: Innovation Centre - Fire Alarm Upgrades, February 1, 2016 - March 4, 2016, 8:30am-4:30pm
Law Building - Domestic Cold Water Shutdown, February 19, 2016, 8:00am-4:00pm
Biology - Fire Alarm Testing Modifications, February 12, 2016, 7:45am-8:30am
Dillon Hall DH - Elevator Shutdown, April 25 - 29, 2016, 8:30 am - 4:30 pm
Odette School of Business - Domestic Hot water Shutdown, February 5, 2016, 8:00am-4:00pm
Biology-Vacuum Shutdown, February 5, 2016, 9:30am-12:00pm
Welcome Centre - Installation of exterior lighting, February 5 - 8, 2016, 7:00 am - 5:00 pm
Odette School of Business - Domestic Hot water Shutdown, February 2, 2016, 2:30pm - 4:00pm
Campus Wide Power Outage - May 14, 2016, 6:00am - 6:00pm
Law Building - Water Main Break Repaired, February 1, 2016, 2:00pm
Law Building - Water Main Break, February 1, 2016, 10:00am - 6:00pm
Innovation Centre/Parking Garage -Fire Alarm Upgrades, February 1 - March 4, 2016, 8:30am-4:30pm
January 2016
Chrysler Hall North - Domestic Hot Water Shutdown, January 28, 2016, 8:00am - 10:00am
Windsor Star Building - Microwave Breakers, January 25, 2016, 7:00am-4:00pm
Central Refrigeration Plant - Condenser Water Piping, January 25-29, 2016, 7:00am-4:00pm
Biology - Heating, January 25-29, 2016, 7:00am-4:00pm
Lambton Tower Elevators Back in Service - January 22, 2016
Welcome Centre - Heating, January 21, 2016, 7:00am-4:00pm
Centre for Engineering Innovation - Fire Alarm Testing, January 21, 2016, 8:30am-4:30pm
Essex Hall - Lab 394-3 Renovations, January 18-22, 2016, 8:00am-4:00pm
Dillon Hall - Fire Alarm Shutdown, January 18, 2016, 8:00am -4:00pm
Lambton Tower Elevator Out of Service until further notice.
Chrysler Hall South Elevator Out of Service until further notice.
Education Gym - Elevator Back in Service, January 11, 2016
Cartier Hall - Elevator Back in Service, January 11, 2016
Dillon Hall - Sprinkler System Installation/Fire Alarm Shutdown - January 13, 2016, 8:00am-4:00pm
University Computer Centre - Data Drops Installation, January 11-12, 2016, 7:00am-4:00pm
Lambton Tower - East Elevator Out of Service
Biology Building - Emergency Shutdown Asbestos Enclosure, January 8, 2016, 6:00am-10:00am
Lambton Tower - West Elevator Out of Service, January 7, 2016, 2:00pm-6:00pm
Education Gym - Elevator Out of Service
December 2015
Law Building-Heat Shutdown, December 19, 2015 - January 4, 2016, 6:00am - 11:00am
Education Building-Security Upgrades, December 15, 2015 - December 12, 2016, 7:30am-4:30pm
Biology-Ductwork Capping, December 21, 2015, 8:30am-5:00pm
Essex Hall-Steam Leak, December 21, 2015, 6:00am-12:00pm
Chrysler Hall Tower-Fire Alarm System, December 21, 2015, 8:00am-3:30pm
Essex Hall - Floor Drain Repair, December 15, 2015, 10:00am - 4:00pm
Innovation Centre - Install Fire Alarm Pull-Station, December 16-21, 2015, 8:00am-4:00pm
Law Building - HVAC Repair, December 21, 2015 to January 3, 2016, 6:00am - 11:00am
Human Kinetics - HVAC Repair, December 15-16, 2015, 7:00am - 4:00pm
Katzman Lounge, Vanier Hall - Painting, December 17-31, 2015, 7:00am-5:00pm
Assumption Hall - Domestic Hotwater Shutdown, December 8, 2015, 8:00am - 10:00am
Odette School of Business - Heat Pump Replacement, December 12-13, 2015, 6:00am-4:00pm
Pitt Ferry Building - IR Scan/Ground Grid Testing - December 8-9, 2015, 12:00pm-8:00pm
LeBel Building-Natural Gas Shutdown, December 9, 2015, 9:00am-12:00pm
Essex Hall - Condensate Leak, December 5-9, 2015, 8:00am-12:00pm
Essex Hall - Electrical Panel Installation, December 4, 2015, 7:30am-9:00am
Biology-Renovations/Asbestos Abatement, December 2, 2015 to September 30, 2016, 7:00am-5:00pm
Essex Hall - Service Shutdown, December 15-16, 2015, 8:00am-4:00pm
Welcome Centre - Commissioning of the Heating System, December 8-9, 2015, 7:00am-5:00pm
Essex Hall - Asbestos Abatement, Type II, December 10-11, 2015, 4:30pm-10:30pm
Chrysler Hall Tower - Fire Dampers & Actuators Installation, December 4-5, 2015, 7:30am-1:00pm
November 2015
Essex Hall - Lab 287 Renovations, December 1, 2015 - January 30, 2016, 8:00 am to 4:00 pm
Biology BIO and Essex Hall EH - Equipment Moves, November 25 - 27, 8:30 am - 4:30 pm
Maintenance Building - Partial Heating, November 25, 2015, 7:00am - 7:00pm
Essex Hall - Center Elevator Out of Service, November 24, 2015-February 29, 2016, 6:00am-6:00pm
Erie Hall/Lambton Tower - Washroom Upgrades Project, November 28, 2015, 7:00am-7:00pm
Law Building Upgrades, August 24, 2015-November 30, 2015, 8:00am - 5:00pm
Human Kinetics - Heating & Cooling, November 17-19, 2015, 6:00am - 7:00pm
Chrysler Hall North/Chrysler Hall Tower-Elevator Out of Service, November 19, 2015, 8:00am - 5:00pm
Essex Hall/Chrysler Hall Tower, Elevator Out of Service, November 18, 2015, 8:00am - 5:00pm
Dillon Hall/Memorial Hall - Building Power Shutdown, November 19, 2015, 6:00am - 7:45am
Lambton Tower - Elevator Out of Service, November 17-25, 2015
CAWSC Freight Elevator Out of Service, November 17, 2015, 9:00am - 4:00pm
HK Penthouse - Heating and Cooling, November 17, 2015 from 6:00am - 6:00 pm
167 Ferry Street - Heating and Cooling, November 14-15, 2015, 12:00pm - 6:00pm
Biology - Elevator Out of Service, November 16, 2015, 9:00am-7:00pm
University Computer Centre - Camera Installation, November 17-19, 2015, 7:00am-5:00pm
GLIER - Electrical Upgrade, November 16, 2015, 7:00am - 8:00am
GLIER – Fire Alarm System, November 12, 2015, 7:30am-9:00am
Dillon Hall - Building Power Shutdown, November 17, 2015, 6:00am-7:45am
Leddy Library (East) Main Building - Washroom Upgrades, November 12, 2015, 8:30am-12:00pm